Quality Control of Roller Compacted Concrete Engineering in Dam of Guangzhao Hydroelectricity Station in Beipanjiang River of Guizhou
Saved in:
| Main Author: | CHEN Guang-ping |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2009-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47662697&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Safety Supervision of Civil Engineering Work in Dam of Guangzhao Hydropower Station in Guizhou
by: CHEN Cuang-ping
Published: (2009-01-01) -
Introduction of Roller Compacted Concrete Dam Engineering Measures in Huizhou Pumped Storage Power Station
by: LEI Zhen
Published: (2009-01-01) -
Construction Technology of Roller Compaction for the Dam of Shankou Ⅲ Hydropower Station
by: 蓝腾辉, et al.
Published: (2004-01-01) -
Optimization of time and temperature of dam construction for thermal analysis of roller compacted concrete dam
by: Ramtin Sobhkhiz Foumani, et al.
Published: (2023-06-01) -
Cause Analysis of Roller Compacted Concrete Corrosion in Dam of Xiaoyangxi Reservoir
by: CHEN Wen-bin, et al.
Published: (2009-01-01)