Hidri, L., Gharbi, A., & Louly, M. A. Efficient Bounding Schemes for the Two-Center Hybrid Flow Shop Scheduling Problem with Removal Times. Wiley.
Chicago Style (17th ed.) CitationHidri, Lotfi, Anis Gharbi, and Mohamed Aly Louly. Efficient Bounding Schemes for the Two-Center Hybrid Flow Shop Scheduling Problem with Removal Times. Wiley.
MLA (9th ed.) CitationHidri, Lotfi, et al. Efficient Bounding Schemes for the Two-Center Hybrid Flow Shop Scheduling Problem with Removal Times. Wiley.
Warning: These citations may not always be 100% accurate.