Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge
Based on the steel box girder curve incremental launching project of SW ramp bridge in Harbin East Third Ring Road, the geometric alignment and structural internal force of the steel box girder during the incremental launching process were monitored in the whole process. The curve incremental launch...
Saved in:
Main Authors: | Haipeng Wang, Kai Wang, Nan Guo |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/3641683 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction Control Technology and Monitoring Analysis of Walking Incremental Launching Construction of Small-Curvature Steel Box Girder Bridges Across Expressways
by: Hai Huang, et al.
Published: (2025-01-01) -
Study on the Dynamic Response of Composite Box Girder Bridges with Corrugated Steel Webs
by: Ya-Na Mao, et al.
Published: (2023-01-01) -
Fatigue Performance of Steel-Concrete Composite Continuous Box Girder Bridge Deck
by: Yuanxun Zheng, et al.
Published: (2021-01-01) -
Analysis of Sunshine Temperature Field of Steel Box Girder Based on Monitoring Data
by: Hailin Lu, et al.
Published: (2020-01-01) -
Temperature Field and Gradient Effect of a Steel-Concrete Composite Box Girder Bridge
by: Haoxu Li, et al.
Published: (2021-01-01)