Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge

Based on the steel box girder curve incremental launching project of SW ramp bridge in Harbin East Third Ring Road, the geometric alignment and structural internal force of the steel box girder during the incremental launching process were monitored in the whole process. The curve incremental launch...

Full description

Saved in:
Bibliographic Details
Main Authors: Haipeng Wang, Kai Wang, Nan Guo
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2022/3641683
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832558413784023040
author Haipeng Wang
Kai Wang
Nan Guo
author_facet Haipeng Wang
Kai Wang
Nan Guo
author_sort Haipeng Wang
collection DOAJ
description Based on the steel box girder curve incremental launching project of SW ramp bridge in Harbin East Third Ring Road, the geometric alignment and structural internal force of the steel box girder during the incremental launching process were monitored in the whole process. The curve incremental launching coordinate position control method was adopted, and the relevant parameters were modified according to the site construction situation and the initial stress conditions of the girders, and the corrected theoretical value was used as the control and evaluation basis of the monitoring value. The results showed that the original theoretical deflection value was −33.10 mm, the modified theoretical deflection value was −64.10 mm, and the actual monitoring value was −53.20 mm. The modified theoretical value agreed well with the monitoring value, and the error rate between the monitoring value and the theoretical value under each working condition was −17.82%∼14.48%. The geometric alignment and internal force of the steel box girder met the monitoring requirements, ensuring that the steel box girder can meet the design requirements under various working conditions.
format Article
id doaj-art-ca067734ada943079e86fea30a9cbf58
institution Kabale University
issn 1687-8094
language English
publishDate 2022-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-ca067734ada943079e86fea30a9cbf582025-02-03T01:32:30ZengWileyAdvances in Civil Engineering1687-80942022-01-01202210.1155/2022/3641683Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder BridgeHaipeng Wang0Kai Wang1Nan Guo2Institute of Cold Regions Science and EngineeringInstitute of Cold Regions Science and EngineeringDepartment of Civil EngineeringBased on the steel box girder curve incremental launching project of SW ramp bridge in Harbin East Third Ring Road, the geometric alignment and structural internal force of the steel box girder during the incremental launching process were monitored in the whole process. The curve incremental launching coordinate position control method was adopted, and the relevant parameters were modified according to the site construction situation and the initial stress conditions of the girders, and the corrected theoretical value was used as the control and evaluation basis of the monitoring value. The results showed that the original theoretical deflection value was −33.10 mm, the modified theoretical deflection value was −64.10 mm, and the actual monitoring value was −53.20 mm. The modified theoretical value agreed well with the monitoring value, and the error rate between the monitoring value and the theoretical value under each working condition was −17.82%∼14.48%. The geometric alignment and internal force of the steel box girder met the monitoring requirements, ensuring that the steel box girder can meet the design requirements under various working conditions.http://dx.doi.org/10.1155/2022/3641683
spellingShingle Haipeng Wang
Kai Wang
Nan Guo
Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge
Advances in Civil Engineering
title Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge
title_full Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge
title_fullStr Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge
title_full_unstemmed Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge
title_short Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge
title_sort coordinate monitoring technology in the process of incremental launching construction of curved steel box girder bridge
url http://dx.doi.org/10.1155/2022/3641683
work_keys_str_mv AT haipengwang coordinatemonitoringtechnologyintheprocessofincrementallaunchingconstructionofcurvedsteelboxgirderbridge
AT kaiwang coordinatemonitoringtechnologyintheprocessofincrementallaunchingconstructionofcurvedsteelboxgirderbridge
AT nanguo coordinatemonitoringtechnologyintheprocessofincrementallaunchingconstructionofcurvedsteelboxgirderbridge