Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway

Continuous welded rail (CWR) has been widely applied to the Chinese high-speed railways. It is interesting to reduce the effect of rail longitudinal force on the long-span cable-stayed bridges. Taking the pile-soil interaction into account, the finite element model of CWR on the long-span cable-stay...

Full description

Saved in:
Bibliographic Details
Main Authors: Xiaopei Cai, Wanli Liu, Kaize Xie, Wenjun Zhu, Xiyuan Tan, Yongjie Gao
Format: Article
Language:English
Published: Wiley 2020-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2020/8855140
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832568525515915264
author Xiaopei Cai
Wanli Liu
Kaize Xie
Wenjun Zhu
Xiyuan Tan
Yongjie Gao
author_facet Xiaopei Cai
Wanli Liu
Kaize Xie
Wenjun Zhu
Xiyuan Tan
Yongjie Gao
author_sort Xiaopei Cai
collection DOAJ
description Continuous welded rail (CWR) has been widely applied to the Chinese high-speed railways. It is interesting to reduce the effect of rail longitudinal force on the long-span cable-stayed bridges. Taking the pile-soil interaction into account, the finite element model of CWR on the long-span cable-stayed bridge is established based on the bridge-track interaction theory. The rail longitudinal force can be reduced and the track stability can be improved significantly by installing Rail Expansion Joint (REJ). The layout scheme of REJ plays a controlling role on designing CWR on bridges. Results show that the unidirectional REJ should be laid on both ends of the long-span cable-stayed bridge. Switch rails of REJ are set up on the main beam, stock rails are laid on the simply supported beams and crossing over beam joints, and several-meter long small resistance fasteners need to be laid on the sides of stock rails to reduce the fixed pier longitudinal force near the main beam. The range of REJ laid on cable-stayed bridge is mainly determined by temperature, rail breaking, and seismic condition; the bending and braking loads have little influence on it. Multiple field tests are carried out to prove the validity of the numerical model and the design methodology.
format Article
id doaj-art-c8b057cdc5834e0bb9a00e7d1b424aca
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2020-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-c8b057cdc5834e0bb9a00e7d1b424aca2025-02-03T00:58:57ZengWileyAdvances in Civil Engineering1687-80861687-80942020-01-01202010.1155/2020/88551408855140Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed RailwayXiaopei Cai0Wanli Liu1Kaize Xie2Wenjun Zhu3Xiyuan Tan4Yongjie Gao5School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, ChinaSchool of Civil Engineering, Beijing Jiaotong University, Beijing 100044, ChinaStructural Health Monitoring and Control Institute, Shijiazhuang Tiedao University, Shijiazhuang 050043, ChinaShanghai Key Laboratory of Rail Infrastructure Durability and System Safety, College of Transportation Engineering, Tongji University, Shanghai 201804, ChinaSchool of Civil Engineering, Beijing Jiaotong University, Beijing 100044, ChinaChina Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430000, ChinaContinuous welded rail (CWR) has been widely applied to the Chinese high-speed railways. It is interesting to reduce the effect of rail longitudinal force on the long-span cable-stayed bridges. Taking the pile-soil interaction into account, the finite element model of CWR on the long-span cable-stayed bridge is established based on the bridge-track interaction theory. The rail longitudinal force can be reduced and the track stability can be improved significantly by installing Rail Expansion Joint (REJ). The layout scheme of REJ plays a controlling role on designing CWR on bridges. Results show that the unidirectional REJ should be laid on both ends of the long-span cable-stayed bridge. Switch rails of REJ are set up on the main beam, stock rails are laid on the simply supported beams and crossing over beam joints, and several-meter long small resistance fasteners need to be laid on the sides of stock rails to reduce the fixed pier longitudinal force near the main beam. The range of REJ laid on cable-stayed bridge is mainly determined by temperature, rail breaking, and seismic condition; the bending and braking loads have little influence on it. Multiple field tests are carried out to prove the validity of the numerical model and the design methodology.http://dx.doi.org/10.1155/2020/8855140
spellingShingle Xiaopei Cai
Wanli Liu
Kaize Xie
Wenjun Zhu
Xiyuan Tan
Yongjie Gao
Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway
Advances in Civil Engineering
title Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway
title_full Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway
title_fullStr Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway
title_full_unstemmed Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway
title_short Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway
title_sort layout optimization of rail expansion joint on long span cable stayed bridge for high speed railway
url http://dx.doi.org/10.1155/2020/8855140
work_keys_str_mv AT xiaopeicai layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway
AT wanliliu layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway
AT kaizexie layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway
AT wenjunzhu layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway
AT xiyuantan layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway
AT yongjiegao layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway