Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway
Continuous welded rail (CWR) has been widely applied to the Chinese high-speed railways. It is interesting to reduce the effect of rail longitudinal force on the long-span cable-stayed bridges. Taking the pile-soil interaction into account, the finite element model of CWR on the long-span cable-stay...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8855140 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832568525515915264 |
---|---|
author | Xiaopei Cai Wanli Liu Kaize Xie Wenjun Zhu Xiyuan Tan Yongjie Gao |
author_facet | Xiaopei Cai Wanli Liu Kaize Xie Wenjun Zhu Xiyuan Tan Yongjie Gao |
author_sort | Xiaopei Cai |
collection | DOAJ |
description | Continuous welded rail (CWR) has been widely applied to the Chinese high-speed railways. It is interesting to reduce the effect of rail longitudinal force on the long-span cable-stayed bridges. Taking the pile-soil interaction into account, the finite element model of CWR on the long-span cable-stayed bridge is established based on the bridge-track interaction theory. The rail longitudinal force can be reduced and the track stability can be improved significantly by installing Rail Expansion Joint (REJ). The layout scheme of REJ plays a controlling role on designing CWR on bridges. Results show that the unidirectional REJ should be laid on both ends of the long-span cable-stayed bridge. Switch rails of REJ are set up on the main beam, stock rails are laid on the simply supported beams and crossing over beam joints, and several-meter long small resistance fasteners need to be laid on the sides of stock rails to reduce the fixed pier longitudinal force near the main beam. The range of REJ laid on cable-stayed bridge is mainly determined by temperature, rail breaking, and seismic condition; the bending and braking loads have little influence on it. Multiple field tests are carried out to prove the validity of the numerical model and the design methodology. |
format | Article |
id | doaj-art-c8b057cdc5834e0bb9a00e7d1b424aca |
institution | Kabale University |
issn | 1687-8086 1687-8094 |
language | English |
publishDate | 2020-01-01 |
publisher | Wiley |
record_format | Article |
series | Advances in Civil Engineering |
spelling | doaj-art-c8b057cdc5834e0bb9a00e7d1b424aca2025-02-03T00:58:57ZengWileyAdvances in Civil Engineering1687-80861687-80942020-01-01202010.1155/2020/88551408855140Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed RailwayXiaopei Cai0Wanli Liu1Kaize Xie2Wenjun Zhu3Xiyuan Tan4Yongjie Gao5School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, ChinaSchool of Civil Engineering, Beijing Jiaotong University, Beijing 100044, ChinaStructural Health Monitoring and Control Institute, Shijiazhuang Tiedao University, Shijiazhuang 050043, ChinaShanghai Key Laboratory of Rail Infrastructure Durability and System Safety, College of Transportation Engineering, Tongji University, Shanghai 201804, ChinaSchool of Civil Engineering, Beijing Jiaotong University, Beijing 100044, ChinaChina Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430000, ChinaContinuous welded rail (CWR) has been widely applied to the Chinese high-speed railways. It is interesting to reduce the effect of rail longitudinal force on the long-span cable-stayed bridges. Taking the pile-soil interaction into account, the finite element model of CWR on the long-span cable-stayed bridge is established based on the bridge-track interaction theory. The rail longitudinal force can be reduced and the track stability can be improved significantly by installing Rail Expansion Joint (REJ). The layout scheme of REJ plays a controlling role on designing CWR on bridges. Results show that the unidirectional REJ should be laid on both ends of the long-span cable-stayed bridge. Switch rails of REJ are set up on the main beam, stock rails are laid on the simply supported beams and crossing over beam joints, and several-meter long small resistance fasteners need to be laid on the sides of stock rails to reduce the fixed pier longitudinal force near the main beam. The range of REJ laid on cable-stayed bridge is mainly determined by temperature, rail breaking, and seismic condition; the bending and braking loads have little influence on it. Multiple field tests are carried out to prove the validity of the numerical model and the design methodology.http://dx.doi.org/10.1155/2020/8855140 |
spellingShingle | Xiaopei Cai Wanli Liu Kaize Xie Wenjun Zhu Xiyuan Tan Yongjie Gao Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway Advances in Civil Engineering |
title | Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway |
title_full | Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway |
title_fullStr | Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway |
title_full_unstemmed | Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway |
title_short | Layout Optimization of Rail Expansion Joint on Long-Span Cable-Stayed Bridge for High-Speed Railway |
title_sort | layout optimization of rail expansion joint on long span cable stayed bridge for high speed railway |
url | http://dx.doi.org/10.1155/2020/8855140 |
work_keys_str_mv | AT xiaopeicai layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway AT wanliliu layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway AT kaizexie layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway AT wenjunzhu layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway AT xiyuantan layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway AT yongjiegao layoutoptimizationofrailexpansionjointonlongspancablestayedbridgeforhighspeedrailway |