A Combined Clearing Model of Electric Energy, Inertia, and Primary Frequency Regulation Considering Emergency Interruptible Load Service

The ever-increasing proportion of new energy units has led to prominent frequency safety issues in the power system. In order to avoid serious accidents after the system encounters large disturbance, it is necessary to purchase inertia and primary frequency regulation auxiliary services and integrat...

Full description

Saved in:
Bibliographic Details
Main Author: ZHU Lan, ZHANG Xuehan, TANG Longjun, QIU Nianhang, TIAN Yingjie
Format: Article
Language:zho
Published: Editorial Office of Journal of Shanghai Jiao Tong University 2025-01-01
Series:Shanghai Jiaotong Daxue xuebao
Subjects:
Online Access:https://xuebao.sjtu.edu.cn/article/2025/1006-2467/1006-2467-59-1-16.shtml
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The ever-increasing proportion of new energy units has led to prominent frequency safety issues in the power system. In order to avoid serious accidents after the system encounters large disturbance, it is necessary to purchase inertia and primary frequency regulation auxiliary services and integrate rapid response resources such as emergency interruptible load service into the system. Therefore, based on a review of the domestic and foreign inertia ancillary service market, the frequency safety constraints considering the emergency interruptible load service are derived, and a joint clearing model of electric energy, inertia, and primary frequency regulation auxiliary services is proposed, considering emergency interruptible load service. Then, the model is transformed into a mixed integer second-order cone programming model for optimization. Finally, the effectiveness of the model is verified based on a numerical example, and the influence of the frequency safety constraints on the system clearing results is discussed.
ISSN:1006-2467