Optimization of Cogent Plant Steam Supply Integrated with PLC Control System in PT. MNA Kuala Tanjung

Economic dispatch is often used in general to solve the problem of optimizing the fuel consumption of the electric power system, which focuses on developing optimization methods for a generation system. SCADA/PLC is used so that Economic Dispatch can run in real time on a system. In this research,...

Full description

Saved in:
Bibliographic Details
Main Authors: Dedy Agussyah Putra, Muchsin Harahap
Format: Article
Language:English
Published: Lembaga Penelitian dan Pengadian kepada Masyarakat Universitas Andalas 2023-09-01
Series:Andalasian International Journal of Agricultural and Natural Sciences
Subjects:
Online Access:https://chipset.fti.unand.ac.id/index.php/aijans/article/view/35
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832595639969513472
author Dedy Agussyah Putra
Muchsin Harahap
author_facet Dedy Agussyah Putra
Muchsin Harahap
author_sort Dedy Agussyah Putra
collection DOAJ
description Economic dispatch is often used in general to solve the problem of optimizing the fuel consumption of the electric power system, which focuses on developing optimization methods for a generation system. SCADA/PLC is used so that Economic Dispatch can run in real time on a system. In this research, an automation system will be designed that integrates Economic Dispatch into PLC in a generating system of 3 production boilers operating simultaneously (Cogent System) which aims to ensure that the Economic Dispatch system can run in real time. The simulation results show that the Economic Dispatch program on the PLC can run well. In the simulation of a steam load of 76 MT, the optimal value for boiler 1 is 45 MT and for boiler 3 it is 31 MT while in boiler 2 it is 0 MT, with the opportunity to save boiler fuel use by 16.8% and steam production cost can be reduced by 10% from its initial value.
format Article
id doaj-art-c16c8322fcb54b6984ff436b3ee9c041
institution Kabale University
issn 2776-6500
2745-7885
language English
publishDate 2023-09-01
publisher Lembaga Penelitian dan Pengadian kepada Masyarakat Universitas Andalas
record_format Article
series Andalasian International Journal of Agricultural and Natural Sciences
spelling doaj-art-c16c8322fcb54b6984ff436b3ee9c0412025-01-18T10:11:19ZengLembaga Penelitian dan Pengadian kepada Masyarakat Universitas AndalasAndalasian International Journal of Agricultural and Natural Sciences2776-65002745-78852023-09-01301Optimization of Cogent Plant Steam Supply Integrated with PLC Control System in PT. MNA Kuala TanjungDedy Agussyah Putra0Muchsin Harahap1Immanuel College of TechnologyTanjungbalai Polytechnic Economic dispatch is often used in general to solve the problem of optimizing the fuel consumption of the electric power system, which focuses on developing optimization methods for a generation system. SCADA/PLC is used so that Economic Dispatch can run in real time on a system. In this research, an automation system will be designed that integrates Economic Dispatch into PLC in a generating system of 3 production boilers operating simultaneously (Cogent System) which aims to ensure that the Economic Dispatch system can run in real time. The simulation results show that the Economic Dispatch program on the PLC can run well. In the simulation of a steam load of 76 MT, the optimal value for boiler 1 is 45 MT and for boiler 3 it is 31 MT while in boiler 2 it is 0 MT, with the opportunity to save boiler fuel use by 16.8% and steam production cost can be reduced by 10% from its initial value. https://chipset.fti.unand.ac.id/index.php/aijans/article/view/35Economic DispatchPLC IntegrationFuel Optimization
spellingShingle Dedy Agussyah Putra
Muchsin Harahap
Optimization of Cogent Plant Steam Supply Integrated with PLC Control System in PT. MNA Kuala Tanjung
Andalasian International Journal of Agricultural and Natural Sciences
Economic Dispatch
PLC Integration
Fuel Optimization
title Optimization of Cogent Plant Steam Supply Integrated with PLC Control System in PT. MNA Kuala Tanjung
title_full Optimization of Cogent Plant Steam Supply Integrated with PLC Control System in PT. MNA Kuala Tanjung
title_fullStr Optimization of Cogent Plant Steam Supply Integrated with PLC Control System in PT. MNA Kuala Tanjung
title_full_unstemmed Optimization of Cogent Plant Steam Supply Integrated with PLC Control System in PT. MNA Kuala Tanjung
title_short Optimization of Cogent Plant Steam Supply Integrated with PLC Control System in PT. MNA Kuala Tanjung
title_sort optimization of cogent plant steam supply integrated with plc control system in pt mna kuala tanjung
topic Economic Dispatch
PLC Integration
Fuel Optimization
url https://chipset.fti.unand.ac.id/index.php/aijans/article/view/35
work_keys_str_mv AT dedyagussyahputra optimizationofcogentplantsteamsupplyintegratedwithplccontrolsysteminptmnakualatanjung
AT muchsinharahap optimizationofcogentplantsteamsupplyintegratedwithplccontrolsysteminptmnakualatanjung