Modifications of the Stress-State of Cable-Stayed Bridges due to Staggered Construction of their Superstructure
In current practice, the effects of the evolutionary erection of cable-stayed bridge superstructure are rarely included into the simulation of its tensioning process. In fact, stay forces in service are usually defined in early stages of design, when the construction process has not even been concei...
Saved in:
| Main Authors: | Jose Antonio Lozano-Galant, Lidia Ruiz-Ripoll, Ignacio Payá-Zaforteza, José Turmo |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Riga Technical University Press
2014-12-01
|
| Series: | The Baltic Journal of Road and Bridge Engineering |
| Subjects: | |
| Online Access: | https://bjrbe-journals.rtu.lv/article/view/3515 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Effects in Service of the Staggered Construction of Cable-Stayed Bridges Built on Temporary Supports
by: Jose Antonio Lozano-Galant, et al.
Published: (2015-09-01) -
Evaluation of Cable Tension Using Static and Dynamic Test on R.H. Fisabilillah Cable-Stayed Bridge, Batam-Indonesia
by: Hinawan Teguh Santoso, et al.
Published: (2023-04-01) -
Design and Analysis of a Partially Cable-Stayed Bridge over the Mingyue Qujiang River in Guang'an
by: Yiyun Zhou, et al.
Published: (2023-06-01) -
A Mixed Approach for Determination of Initial Cable Forces in Cable-Stayed Bridges and the Parameters Variability
by: Antonino Recupero, et al.
Published: (2015-06-01) -
Analysis of Interaction Between the Elements in Cable-Stayed Bridge
by: Verners Straupe, et al.
Published: (2012-06-01)