Simulating the line balance to provide an improvement plan for optimal production and costing in petrochemical industries
This research examines the influential factors and theoretical principles of queuing in balancing production lines. The required information, including the number of active machines on the production line, the level of station idleness, and the waiting time for parts to receive services, has been qu...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | fas |
Published: |
University of Qom
2024-09-01
|
Series: | مدیریت مهندسی و رایانش نرم |
Subjects: | |
Online Access: | https://jemsc.qom.ac.ir/article_3052_30d337b8e1c0d197988a2b799f5ccfc0.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832577554477744128 |
---|---|
author | Asghar Hemmati Farshad Kaveh Milad Abolghasemian Adel Pourghader chobar |
author_facet | Asghar Hemmati Farshad Kaveh Milad Abolghasemian Adel Pourghader chobar |
author_sort | Asghar Hemmati |
collection | DOAJ |
description | This research examines the influential factors and theoretical principles of queuing in balancing production lines. The required information, including the number of active machines on the production line, the level of station idleness, and the waiting time for parts to receive services, has been quantitatively gathered through on-site observations and interviews with managers and supervisors. Process modeling has been developed using the ARENA simulation software version 13, which can identify the current status of tank and heavy product production in terms of queuing and line balance criteria, and its results are analyzed and described. The findings of this research indicate that the addition of a forklift increases costs from 65,902 monetary units to 80,577, equivalent to a 22% increase. However, this change results in a doubling of production compared to the current state; therefore, the extra expenditure due to increased production is satisfactory for the managers of this organization. The significance of this production increase aligns with enhanced productivity, especially considering the greater emphasis placed on production targets. |
format | Article |
id | doaj-art-bc4decfb7c544100bd24de2d4e57cbed |
institution | Kabale University |
issn | 2538-6239 2538-2675 |
language | fas |
publishDate | 2024-09-01 |
publisher | University of Qom |
record_format | Article |
series | مدیریت مهندسی و رایانش نرم |
spelling | doaj-art-bc4decfb7c544100bd24de2d4e57cbed2025-01-30T20:19:19ZfasUniversity of Qomمدیریت مهندسی و رایانش نرم2538-62392538-26752024-09-0110119021210.22091/jemsc.2024.11189.11983052Simulating the line balance to provide an improvement plan for optimal production and costing in petrochemical industriesAsghar Hemmati0Farshad Kaveh1Milad Abolghasemian2Adel Pourghader chobar3Assistance prof. Department of Industrial Engineering, Abhar Branch, Islamic Azad University, Abhar, Iran, Email: Hemati.asghar@iau.irPhD student, Department of Industrial Engineering, Najafabad Branch, Islamic Azad University, Najafabad, Iran, Email: Farshadkaveh@gmail.comPhD. Department of Industrial Engineering, Lahijan Branch, Islamic Azad University, Lahijan, Iran, Email: m.abolghasemian.bt@gmail.comPhD. Department of Industrial Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran, Email: apourghader@qiau.ac.irThis research examines the influential factors and theoretical principles of queuing in balancing production lines. The required information, including the number of active machines on the production line, the level of station idleness, and the waiting time for parts to receive services, has been quantitatively gathered through on-site observations and interviews with managers and supervisors. Process modeling has been developed using the ARENA simulation software version 13, which can identify the current status of tank and heavy product production in terms of queuing and line balance criteria, and its results are analyzed and described. The findings of this research indicate that the addition of a forklift increases costs from 65,902 monetary units to 80,577, equivalent to a 22% increase. However, this change results in a doubling of production compared to the current state; therefore, the extra expenditure due to increased production is satisfactory for the managers of this organization. The significance of this production increase aligns with enhanced productivity, especially considering the greater emphasis placed on production targets.https://jemsc.qom.ac.ir/article_3052_30d337b8e1c0d197988a2b799f5ccfc0.pdfsimulationproduction line balancecosting |
spellingShingle | Asghar Hemmati Farshad Kaveh Milad Abolghasemian Adel Pourghader chobar Simulating the line balance to provide an improvement plan for optimal production and costing in petrochemical industries مدیریت مهندسی و رایانش نرم simulation production line balance costing |
title | Simulating the line balance to provide an improvement plan for optimal production and costing in petrochemical industries |
title_full | Simulating the line balance to provide an improvement plan for optimal production and costing in petrochemical industries |
title_fullStr | Simulating the line balance to provide an improvement plan for optimal production and costing in petrochemical industries |
title_full_unstemmed | Simulating the line balance to provide an improvement plan for optimal production and costing in petrochemical industries |
title_short | Simulating the line balance to provide an improvement plan for optimal production and costing in petrochemical industries |
title_sort | simulating the line balance to provide an improvement plan for optimal production and costing in petrochemical industries |
topic | simulation production line balance costing |
url | https://jemsc.qom.ac.ir/article_3052_30d337b8e1c0d197988a2b799f5ccfc0.pdf |
work_keys_str_mv | AT asgharhemmati simulatingthelinebalancetoprovideanimprovementplanforoptimalproductionandcostinginpetrochemicalindustries AT farshadkaveh simulatingthelinebalancetoprovideanimprovementplanforoptimalproductionandcostinginpetrochemicalindustries AT miladabolghasemian simulatingthelinebalancetoprovideanimprovementplanforoptimalproductionandcostinginpetrochemicalindustries AT adelpourghaderchobar simulatingthelinebalancetoprovideanimprovementplanforoptimalproductionandcostinginpetrochemicalindustries |