Environmental risk assessment of a dam during construction phase

The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding r...

Full description

Saved in:
Bibliographic Details
Main Authors: S. Rezaian, S.A. Jozi, N. Zaredar
Format: Article
Language:English
Published: GJESM Publisher 2016-12-01
Series:Global Journal of Environmental Science and Management
Subjects:
Online Access:http://www.gjesm.net/article_20481_fdbd1f5c89402fc79f52b1379fcd94e1.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832570523990622208
author S. Rezaian
S.A. Jozi
N. Zaredar
author_facet S. Rezaian
S.A. Jozi
N. Zaredar
author_sort S. Rezaian
collection DOAJ
description The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated by MIKE-11 model. In order to check whether or not the dam construction could affect the quality of the Gavi River, the physicochemical quality of the river water was also tested. Afterwards, a questionnaire was prepared containing an inventory of possible risks supposed to be induced by construction of Gavi Dam. The questionnaires were placed at disposal of experts to score the items based on their importance. The questionnaires were then analyzed using SPSS Software, version 16. According to which, a total number of 12 risk factors were identified. The dam construction risks were qualitatively assessed by preliminary hazard analysis. Based on the results, 3 of 12 identified risks were recognized unacceptable. The shortlisted risks were prioritized at final step using technique for order of preference by similarity to ideal solution. "Habitat fragmentation" with a weight of 0.3002, "water pollution" with a weight of 0.295, and "impacts on aquatics" with a weight of 0.293 were identified as three top priority flooding risks. Among the most important corrective measures for mitigation of the risks at construction phase can be pointed to "restoration of the land cover", “conservation of areas surrounding the dam as a new wildlife habitat", “prevention of water contamination”, and "conservation of fish spawning sites".
format Article
id doaj-art-bbfd90d2ce864d2fa926a2478e0b2056
institution Kabale University
issn 2383-3572
2383-3866
language English
publishDate 2016-12-01
publisher GJESM Publisher
record_format Article
series Global Journal of Environmental Science and Management
spelling doaj-art-bbfd90d2ce864d2fa926a2478e0b20562025-02-02T15:24:22ZengGJESM PublisherGlobal Journal of Environmental Science and Management2383-35722383-38662016-12-012434535610.22034/gjesm.2016.02.04.00420481Environmental risk assessment of a dam during construction phaseS. Rezaian0S.A. Jozi1N. Zaredar2Department of the Environment, Islamic Azad University, Shahrood Branch, Shahrood, IranDepartment of the Environment, Islamic Azad University, North Tehran Branch, Tehran, IranDepartment of Environmental Sciences, Graduate School of the Environment and Energy, Science and Research Branch, Islamic Azad University, Tehran, IranThe present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated by MIKE-11 model. In order to check whether or not the dam construction could affect the quality of the Gavi River, the physicochemical quality of the river water was also tested. Afterwards, a questionnaire was prepared containing an inventory of possible risks supposed to be induced by construction of Gavi Dam. The questionnaires were placed at disposal of experts to score the items based on their importance. The questionnaires were then analyzed using SPSS Software, version 16. According to which, a total number of 12 risk factors were identified. The dam construction risks were qualitatively assessed by preliminary hazard analysis. Based on the results, 3 of 12 identified risks were recognized unacceptable. The shortlisted risks were prioritized at final step using technique for order of preference by similarity to ideal solution. "Habitat fragmentation" with a weight of 0.3002, "water pollution" with a weight of 0.295, and "impacts on aquatics" with a weight of 0.293 were identified as three top priority flooding risks. Among the most important corrective measures for mitigation of the risks at construction phase can be pointed to "restoration of the land cover", “conservation of areas surrounding the dam as a new wildlife habitat", “prevention of water contamination”, and "conservation of fish spawning sites".http://www.gjesm.net/article_20481_fdbd1f5c89402fc79f52b1379fcd94e1.pdfConstruction phaseGavi DamMIKE-11Preliminary hazard analysis (PHA)RiskTechnique for order of preference by similarity to ideal solution (TOPSIS)
spellingShingle S. Rezaian
S.A. Jozi
N. Zaredar
Environmental risk assessment of a dam during construction phase
Global Journal of Environmental Science and Management
Construction phase
Gavi Dam
MIKE-11
Preliminary hazard analysis (PHA)
Risk
Technique for order of preference by similarity to ideal solution (TOPSIS)
title Environmental risk assessment of a dam during construction phase
title_full Environmental risk assessment of a dam during construction phase
title_fullStr Environmental risk assessment of a dam during construction phase
title_full_unstemmed Environmental risk assessment of a dam during construction phase
title_short Environmental risk assessment of a dam during construction phase
title_sort environmental risk assessment of a dam during construction phase
topic Construction phase
Gavi Dam
MIKE-11
Preliminary hazard analysis (PHA)
Risk
Technique for order of preference by similarity to ideal solution (TOPSIS)
url http://www.gjesm.net/article_20481_fdbd1f5c89402fc79f52b1379fcd94e1.pdf
work_keys_str_mv AT srezaian environmentalriskassessmentofadamduringconstructionphase
AT sajozi environmentalriskassessmentofadamduringconstructionphase
AT nzaredar environmentalriskassessmentofadamduringconstructionphase