Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction
The construction of a new shield tunnel near an existing operating tunnel poses a great risk to the existing tunnel structure due to the continuous encryption of the rail transit network. This study investigated the safety status of an existing metro tunnel in close proximity to new shield tunnels f...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Journal of Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/5774764 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832559441800593408 |
---|---|
author | Yong Xu Ming Xia Wei Zhang Zheyu Li Zhiqiang Zhang |
author_facet | Yong Xu Ming Xia Wei Zhang Zheyu Li Zhiqiang Zhang |
author_sort | Yong Xu |
collection | DOAJ |
description | The construction of a new shield tunnel near an existing operating tunnel poses a great risk to the existing tunnel structure due to the continuous encryption of the rail transit network. This study investigated the safety status of an existing metro tunnel in close proximity to new shield tunnels following construction. A fuzzy comprehensive assessment model (hierarchical fuzzy comprehensive evaluation model) based on an analytic hierarchy process was proposed to assess the risks of the existing tunnel structure. The threshold of indicators in the existing tunnel structure risk assessment system was determined based on the tunnel function and structure security. Then, we described the membership vector determination method, weight vector determination method, and comprehensive evaluation vector processing method. Taking a project case in China as the research object, the quantitative analysis of the established evaluation system was carried out, and the intuitive risk assessment results were obtained. The hierarchical fuzzy comprehensive evaluation model can be employed as a decision-making tool for newly built shield tunnels passing through the existing tunnels, which can provide guidance for tunnel maintenance and guarantee. |
format | Article |
id | doaj-art-b9b9af215343478093b4990cd522c62a |
institution | Kabale University |
issn | 2314-4912 |
language | English |
publishDate | 2022-01-01 |
publisher | Wiley |
record_format | Article |
series | Journal of Engineering |
spelling | doaj-art-b9b9af215343478093b4990cd522c62a2025-02-03T01:30:02ZengWileyJournal of Engineering2314-49122022-01-01202210.1155/2022/5774764Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following ConstructionYong Xu0Ming Xia1Wei Zhang2Zheyu Li3Zhiqiang Zhang4Shanghai Tunnel Engineering and Rail Transit Design and Research InstituteNanchang Rail Transit Group Limited CorporationShanghai Tunnel Engineering and Rail Transit Design and Research InstituteShanghai Tunnel Engineering and Rail Transit Design and Research InstituteSouthwest Jiaotong UniversityThe construction of a new shield tunnel near an existing operating tunnel poses a great risk to the existing tunnel structure due to the continuous encryption of the rail transit network. This study investigated the safety status of an existing metro tunnel in close proximity to new shield tunnels following construction. A fuzzy comprehensive assessment model (hierarchical fuzzy comprehensive evaluation model) based on an analytic hierarchy process was proposed to assess the risks of the existing tunnel structure. The threshold of indicators in the existing tunnel structure risk assessment system was determined based on the tunnel function and structure security. Then, we described the membership vector determination method, weight vector determination method, and comprehensive evaluation vector processing method. Taking a project case in China as the research object, the quantitative analysis of the established evaluation system was carried out, and the intuitive risk assessment results were obtained. The hierarchical fuzzy comprehensive evaluation model can be employed as a decision-making tool for newly built shield tunnels passing through the existing tunnels, which can provide guidance for tunnel maintenance and guarantee.http://dx.doi.org/10.1155/2022/5774764 |
spellingShingle | Yong Xu Ming Xia Wei Zhang Zheyu Li Zhiqiang Zhang Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction Journal of Engineering |
title | Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction |
title_full | Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction |
title_fullStr | Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction |
title_full_unstemmed | Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction |
title_short | Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction |
title_sort | risk assessment of an existing metro tunnel in close proximity to new shield tunnels following construction |
url | http://dx.doi.org/10.1155/2022/5774764 |
work_keys_str_mv | AT yongxu riskassessmentofanexistingmetrotunnelincloseproximitytonewshieldtunnelsfollowingconstruction AT mingxia riskassessmentofanexistingmetrotunnelincloseproximitytonewshieldtunnelsfollowingconstruction AT weizhang riskassessmentofanexistingmetrotunnelincloseproximitytonewshieldtunnelsfollowingconstruction AT zheyuli riskassessmentofanexistingmetrotunnelincloseproximitytonewshieldtunnelsfollowingconstruction AT zhiqiangzhang riskassessmentofanexistingmetrotunnelincloseproximitytonewshieldtunnelsfollowingconstruction |