Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
It is installed that hooking two lines and two transformers at scheme distributing device by voltage 330 sQ «transformers – a buses with joining line through two breakers» and three installed transformer on substations brings about reduction of the factor to unavailability in 18,2 times in contrast...
Saved in:
Main Authors: | M. A. Korotkevich, A. L. Starzhinsky |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2012-12-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/180 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Determination of Capacities of Two-Circuit Open-Air Electric Power Lines with Voltage of 35 kV
by: M. A. Korotkevich, et al.
Published: (2004-10-01) -
ESTIMATION OF DECREASING LOSSES OF ACTIVE POWER IN TRANSFORMERS IN SETTING BATTERY OF LOW-VOLTAGE CAPACITORS
by: V. N. Radkevich, et al.
Published: (2014-10-01) -
Reliability Indicators of Urban Electric Network Schemes for Supply of Second and Third Category Consumers
by: M. A. Korotkevich, et al.
Published: (2012-10-01) -
ALGORITHMIZATION OF PROBLEMS FOR OPTIMAL LOCATION OF TRANSFORMERS IN SUBSTATIONS OF DISTRIBUTED NETWORKS
by: M. I. Fursanov, et al.
Published: (2014-08-01) -
Fe, Zn AND S CONTENT IN DOUBLED HAPLOID LINES OF CHINESE SPRING × SQ1 WHEAT POPULATION
by: A. I. Abugalieva, et al.
Published: (2014-12-01)