Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers

It is installed that hooking two lines and two transformers at scheme distributing device by voltage 330 sQ «transformers – a buses with joining line through two breakers» and three installed transformer on substations brings about reduction of the factor to unavailability in 18,2 times in contrast...

Full description

Saved in:
Bibliographic Details
Main Authors: M. A. Korotkevich, A. L. Starzhinsky
Format: Article
Language:Russian
Published: Belarusian National Technical University 2012-12-01
Series:Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
Online Access:https://energy.bntu.by/jour/article/view/180
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832543733864726528
author M. A. Korotkevich
A. L. Starzhinsky
author_facet M. A. Korotkevich
A. L. Starzhinsky
author_sort M. A. Korotkevich
collection DOAJ
description It is installed that hooking two lines and two transformers at scheme distributing device by voltage 330 sQ «transformers – a buses with joining line through two breakers» and three installed transformer on substations brings about reduction of the factor to unavailability in 18,2 times in contrast with scheme with two transformers. At connection of the third transformer through two breakers factor to unavailability practically does not change.At connection one of the transformer through two breakers, at one-and-a-half-breaker scheme RU 330 sQ factor to unavailability falls in 6,6 times to scheme RU 330 sQ «transformers – a buses with joining line through two breakers» under three transformers.
format Article
id doaj-art-b91a30daa0cb485090915a10dd022913
institution Kabale University
issn 1029-7448
2414-0341
language Russian
publishDate 2012-12-01
publisher Belarusian National Technical University
record_format Article
series Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
spelling doaj-art-b91a30daa0cb485090915a10dd0229132025-02-03T11:34:25ZrusBelarusian National Technical UniversityИзвестия высших учебных заведений и энергетических объединенний СНГ: Энергетика1029-74482414-03412012-12-0106174Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power TransformersM. A. Korotkevich0A. L. Starzhinsky1Belarusian National Technical UniversityBelarusian National Technical UniversityIt is installed that hooking two lines and two transformers at scheme distributing device by voltage 330 sQ «transformers – a buses with joining line through two breakers» and three installed transformer on substations brings about reduction of the factor to unavailability in 18,2 times in contrast with scheme with two transformers. At connection of the third transformer through two breakers factor to unavailability practically does not change.At connection one of the transformer through two breakers, at one-and-a-half-breaker scheme RU 330 sQ factor to unavailability falls in 6,6 times to scheme RU 330 sQ «transformers – a buses with joining line through two breakers» under three transformers.https://energy.bntu.by/jour/article/view/180
spellingShingle M. A. Korotkevich
A. L. Starzhinsky
Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
title Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
title_full Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
title_fullStr Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
title_full_unstemmed Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
title_short Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
title_sort estimation to practicability of the building substation by voltage 330 sq with three power transformers
url https://energy.bntu.by/jour/article/view/180
work_keys_str_mv AT makorotkevich estimationtopracticabilityofthebuildingsubstationbyvoltage330sqwiththreepowertransformers
AT alstarzhinsky estimationtopracticabilityofthebuildingsubstationbyvoltage330sqwiththreepowertransformers