Operational Method of Stem Turbine Installation under Non-Conventional Modes
While starting turbines from cold and non-cooled-down states rotors are heated quicker than cylinders due to significantly less weight and more intensive interaction with steam and the value of their differential expansion reaches up to the rated ones in the period of 4-5 hours.The investigations ha...
Saved in:
| Main Authors: | V. P. Kashcheev, E. O. Vоrоnоv, V. A. Khаimоv, A. V. Kashcheev, V. N. Sоrоkin |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
Belarusian National Technical University
2011-04-01
|
| Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
| Online Access: | https://energy.bntu.by/jour/article/view/298 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The ORGANIZATION of language and cognitive activity on the basis of methodology of installation
by: N.V. SOKOVNINA, et al.
Published: (2007-06-01) -
Selection of Asynchronized Turbogenerators Parameters Taking into Account the Operating Mode
by: Shevchenko V.V., et al.
Published: (2024-04-01) -
TWO-STAGE RECRYSTALLIZATION WITH THE REGENERATION OF THE SOLVENT
by: G. А. Nоsоv, et al.
Published: (2017-02-01) -
Contact crystallization of substances from solutions using evaporating refrigerants
by: G. A. Nоsоv, et al.
Published: (2020-11-01) -
Improving the maintenance program for passenger elevators based on simulation of their operating modes
by: D. S. Apryshkin, et al.
Published: (2021-09-01)