RISK MANAGEMENT ANALYSIS IN SPALD-T PROJECTS

The Centralized Domestic Wastewater Management System (SPALD-T) projects play a crucial role in improving urban sanitation but face various risks that can affect project performance. This study aims to analyze the influence of risk factors on SPALD-T project performance in DKI Jakarta. Using a quan...

Full description

Saved in:
Bibliographic Details
Main Authors: Nining Ardiyanti Hasan, Acep Hidayat, Mawardi Amin
Format: Article
Language:English
Published: Universitas Negeri Jakarta 2025-01-01
Series:Jurnal Pensil
Subjects:
Online Access:https://journal.unj.ac.id/unj/index.php/jpensil/article/view/47879
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832575542423977984
author Nining Ardiyanti Hasan
Acep Hidayat
Mawardi Amin
author_facet Nining Ardiyanti Hasan
Acep Hidayat
Mawardi Amin
author_sort Nining Ardiyanti Hasan
collection DOAJ
description The Centralized Domestic Wastewater Management System (SPALD-T) projects play a crucial role in improving urban sanitation but face various risks that can affect project performance. This study aims to analyze the influence of risk factors on SPALD-T project performance in DKI Jakarta. Using a quantitative approach with a cross-sectional design, data were collected through a survey of 125 members of the SPALD-T project team. The questionnaire used has undergone validity and reliability tests to ensure accurate measurement of variables. Multiple regression analysis was employed to test the relationship between risk factors and project performance. The results indicate that waste management risk has a significant and positive influence on project performance, with a regression coefficient of 0.188 and a p-value of 0.001. Meanwhile, technical risk shows a positive trend but is not statistically significant, with a regression coefficient of 0.104 and a p-value of 0.078. These findings emphasize the importance of a comprehensive risk management approach, especially in waste management aspects, to improve SPALD-T project performance. This research contributes to the development of more effective risk mitigation strategies in the context of sanitation infrastructure projects in Indonesia and highlights the need for further research on the interaction between various types of risks in influencing project performance.
format Article
id doaj-art-b5f053ceb99e4173981bca10622684e1
institution Kabale University
issn 2301-8437
2623-1085
language English
publishDate 2025-01-01
publisher Universitas Negeri Jakarta
record_format Article
series Jurnal Pensil
spelling doaj-art-b5f053ceb99e4173981bca10622684e12025-02-01T02:58:19ZengUniversitas Negeri JakartaJurnal Pensil2301-84372623-10852025-01-0114110.21009/jpensil.v14i1.47879RISK MANAGEMENT ANALYSIS IN SPALD-T PROJECTSNining Ardiyanti Hasan0Acep Hidayat1Mawardi Amin2Magister Teknik Sipil, Fakultas Teknik, Universitas Mercu Buana Jalan Meruya Selatan, Kembangan, Jakarta Barat, DKI Jakarta, 11650, IndonesiaMagister Teknik Sipil, Fakultas Teknik, Universitas Mercu Buana Jalan Meruya Selatan, Kembangan, Jakarta Barat, DKI Jakarta, 11650, IndonesiaMaster of Civil Engineering, Faculty of Engineering, Mercu Buana University Jalan Meruya Selatan, Kembangan, West Jakarta, DKI Jakarta, 11650, Indonesia The Centralized Domestic Wastewater Management System (SPALD-T) projects play a crucial role in improving urban sanitation but face various risks that can affect project performance. This study aims to analyze the influence of risk factors on SPALD-T project performance in DKI Jakarta. Using a quantitative approach with a cross-sectional design, data were collected through a survey of 125 members of the SPALD-T project team. The questionnaire used has undergone validity and reliability tests to ensure accurate measurement of variables. Multiple regression analysis was employed to test the relationship between risk factors and project performance. The results indicate that waste management risk has a significant and positive influence on project performance, with a regression coefficient of 0.188 and a p-value of 0.001. Meanwhile, technical risk shows a positive trend but is not statistically significant, with a regression coefficient of 0.104 and a p-value of 0.078. These findings emphasize the importance of a comprehensive risk management approach, especially in waste management aspects, to improve SPALD-T project performance. This research contributes to the development of more effective risk mitigation strategies in the context of sanitation infrastructure projects in Indonesia and highlights the need for further research on the interaction between various types of risks in influencing project performance. https://journal.unj.ac.id/unj/index.php/jpensil/article/view/47879SPALD-T, risk management, project performance, sanitation infrastructure, DKI Jakarta
spellingShingle Nining Ardiyanti Hasan
Acep Hidayat
Mawardi Amin
RISK MANAGEMENT ANALYSIS IN SPALD-T PROJECTS
Jurnal Pensil
SPALD-T, risk management, project performance, sanitation infrastructure, DKI Jakarta
title RISK MANAGEMENT ANALYSIS IN SPALD-T PROJECTS
title_full RISK MANAGEMENT ANALYSIS IN SPALD-T PROJECTS
title_fullStr RISK MANAGEMENT ANALYSIS IN SPALD-T PROJECTS
title_full_unstemmed RISK MANAGEMENT ANALYSIS IN SPALD-T PROJECTS
title_short RISK MANAGEMENT ANALYSIS IN SPALD-T PROJECTS
title_sort risk management analysis in spald t projects
topic SPALD-T, risk management, project performance, sanitation infrastructure, DKI Jakarta
url https://journal.unj.ac.id/unj/index.php/jpensil/article/view/47879
work_keys_str_mv AT niningardiyantihasan riskmanagementanalysisinspaldtprojects
AT acephidayat riskmanagementanalysisinspaldtprojects
AT mawardiamin riskmanagementanalysisinspaldtprojects