Evaluation method of snow accretion around train bogie using model vehicle running apparatus
A method for evaluating snow accretion around a train bogie was investigated using a newly developed model vehicle running apparatus. The model train running apparatus is capable of running a 1/11 scale model train on a 384 m track at a maximum speed of 120 km/h. The phenomenon of snow accretion due...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | Japanese |
Published: |
The Japan Society of Mechanical Engineers
2024-12-01
|
Series: | Nihon Kikai Gakkai ronbunshu |
Subjects: | |
Online Access: | https://www.jstage.jst.go.jp/article/transjsme/91/941/91_24-00181/_pdf/-char/en |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832584952764432384 |
---|---|
author | Hajime TAKAMI Yuto ARAKI |
author_facet | Hajime TAKAMI Yuto ARAKI |
author_sort | Hajime TAKAMI |
collection | DOAJ |
description | A method for evaluating snow accretion around a train bogie was investigated using a newly developed model vehicle running apparatus. The model train running apparatus is capable of running a 1/11 scale model train on a 384 m track at a maximum speed of 120 km/h. The phenomenon of snow accretion due to train running was experimentally simulated by setting up a simulated snow condition in which simulated snow particles were deposited on the track. Comparison of snow accretion on the end blocking vertical panel downstream of the bogies of an intermediate car between real cars and model running tests confirmed that the general characteristics of the snow distribution adhered on the panel can be reproduced. As a result of investigating the growth process of the snow accretion from the model experiment using image processing and 3D scanning, it is found that the initial snow accretion starts from the under side of the vertical panel downstream of the bogie, especially near the wheels. As the travel distance of the snowed section increased, the snow accretion on the under side of the vertical panel extended over the bogie cavity, and snow accretion also occurred on the top and sides of the vertical panel. Eventually, the entire vertical panel was found to be covered with snow accretion. |
format | Article |
id | doaj-art-b5cac2e659634c27880eb255a95f1608 |
institution | Kabale University |
issn | 2187-9761 |
language | Japanese |
publishDate | 2024-12-01 |
publisher | The Japan Society of Mechanical Engineers |
record_format | Article |
series | Nihon Kikai Gakkai ronbunshu |
spelling | doaj-art-b5cac2e659634c27880eb255a95f16082025-01-27T08:34:36ZjpnThe Japan Society of Mechanical EngineersNihon Kikai Gakkai ronbunshu2187-97612024-12-019194124-0018124-0018110.1299/transjsme.24-00181transjsmeEvaluation method of snow accretion around train bogie using model vehicle running apparatusHajime TAKAMI0Yuto ARAKI1Railway Technical Research InstituteRailway Technical Research InstituteA method for evaluating snow accretion around a train bogie was investigated using a newly developed model vehicle running apparatus. The model train running apparatus is capable of running a 1/11 scale model train on a 384 m track at a maximum speed of 120 km/h. The phenomenon of snow accretion due to train running was experimentally simulated by setting up a simulated snow condition in which simulated snow particles were deposited on the track. Comparison of snow accretion on the end blocking vertical panel downstream of the bogies of an intermediate car between real cars and model running tests confirmed that the general characteristics of the snow distribution adhered on the panel can be reproduced. As a result of investigating the growth process of the snow accretion from the model experiment using image processing and 3D scanning, it is found that the initial snow accretion starts from the under side of the vertical panel downstream of the bogie, especially near the wheels. As the travel distance of the snowed section increased, the snow accretion on the under side of the vertical panel extended over the bogie cavity, and snow accretion also occurred on the top and sides of the vertical panel. Eventually, the entire vertical panel was found to be covered with snow accretion.https://www.jstage.jst.go.jp/article/transjsme/91/941/91_24-00181/_pdf/-char/ensnow and ice accretionhigh-speed trainaerodynamicsmultiphase flowparticle |
spellingShingle | Hajime TAKAMI Yuto ARAKI Evaluation method of snow accretion around train bogie using model vehicle running apparatus Nihon Kikai Gakkai ronbunshu snow and ice accretion high-speed train aerodynamics multiphase flow particle |
title | Evaluation method of snow accretion around train bogie using model vehicle running apparatus |
title_full | Evaluation method of snow accretion around train bogie using model vehicle running apparatus |
title_fullStr | Evaluation method of snow accretion around train bogie using model vehicle running apparatus |
title_full_unstemmed | Evaluation method of snow accretion around train bogie using model vehicle running apparatus |
title_short | Evaluation method of snow accretion around train bogie using model vehicle running apparatus |
title_sort | evaluation method of snow accretion around train bogie using model vehicle running apparatus |
topic | snow and ice accretion high-speed train aerodynamics multiphase flow particle |
url | https://www.jstage.jst.go.jp/article/transjsme/91/941/91_24-00181/_pdf/-char/en |
work_keys_str_mv | AT hajimetakami evaluationmethodofsnowaccretionaroundtrainbogieusingmodelvehiclerunningapparatus AT yutoaraki evaluationmethodofsnowaccretionaroundtrainbogieusingmodelvehiclerunningapparatus |