THERMAL EFFICIENCY ANALYSIS OF COMBUSTION TURBINE GENERATOR (821-G-101) PT TRANS PACIFIC PETROCHEMICAL INDOTAMA AFTER MAJOR INSPECTION
The gas turbine is one of the most widely used equipment in oil and gas industries as an electric generator driving system. To maintain the reliability and performance of the gas turbine, a major inspection program is required. Thermal efficiency analysis is the parameters of success in major inspec...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Brawijaya
2024-12-01
|
Series: | Rekayasa Mesin |
Subjects: | |
Online Access: | https://rekayasamesin.ub.ac.id/index.php/rm/article/view/1664 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832592883679494144 |
---|---|
author | Moh Arif Batutah Hadi Kusnanto Indah Kurniawati Achmad Safi’i |
author_facet | Moh Arif Batutah Hadi Kusnanto Indah Kurniawati Achmad Safi’i |
author_sort | Moh Arif Batutah |
collection | DOAJ |
description | The gas turbine is one of the most widely used equipment in oil and gas industries as an electric generator driving system. To maintain the reliability and performance of the gas turbine, a major inspection program is required. Thermal efficiency analysis is the parameters of success in major inspection activities. Thermal efficiency analysis is carried out by comparing data and operating parameters of gas turbine before and after the major inspection. The analysis aims to determine the actual efficiency of each component, and also the actual overall efficiency in the gas turbine. The study result is the actual thermal efficiency of a gas turbine after a major inspection has increased from 12.20% to 12.84% at a load of 6 MW, an increase from 15.76% to 16.77% at a load of 9 MW, and an increase of 18.59% to 20.16% at a load of 12 MW. Based on the actual performance comparison data with design data, it is known that the overall actual performance is still below the design performance, both heat efficiency, heat consumption and heat rate. This is caused by the operating lifetime |
format | Article |
id | doaj-art-b3d577779f8a431b84aaf5620585f0bc |
institution | Kabale University |
issn | 2338-1663 2477-6041 |
language | English |
publishDate | 2024-12-01 |
publisher | University of Brawijaya |
record_format | Article |
series | Rekayasa Mesin |
spelling | doaj-art-b3d577779f8a431b84aaf5620585f0bc2025-01-21T01:57:48ZengUniversity of BrawijayaRekayasa Mesin2338-16632477-60412024-12-011531405141510.21776/jrm.v15i3.16641375THERMAL EFFICIENCY ANALYSIS OF COMBUSTION TURBINE GENERATOR (821-G-101) PT TRANS PACIFIC PETROCHEMICAL INDOTAMA AFTER MAJOR INSPECTIONMoh Arif Batutah0Hadi KusnantoIndah Kurniawati1Achmad Safi’iUM SurabayaUniversitas Muhammadiyah SurabayaThe gas turbine is one of the most widely used equipment in oil and gas industries as an electric generator driving system. To maintain the reliability and performance of the gas turbine, a major inspection program is required. Thermal efficiency analysis is the parameters of success in major inspection activities. Thermal efficiency analysis is carried out by comparing data and operating parameters of gas turbine before and after the major inspection. The analysis aims to determine the actual efficiency of each component, and also the actual overall efficiency in the gas turbine. The study result is the actual thermal efficiency of a gas turbine after a major inspection has increased from 12.20% to 12.84% at a load of 6 MW, an increase from 15.76% to 16.77% at a load of 9 MW, and an increase of 18.59% to 20.16% at a load of 12 MW. Based on the actual performance comparison data with design data, it is known that the overall actual performance is still below the design performance, both heat efficiency, heat consumption and heat rate. This is caused by the operating lifetimehttps://rekayasamesin.ub.ac.id/index.php/rm/article/view/1664thermal efficiencygas turbinemajor inspection |
spellingShingle | Moh Arif Batutah Hadi Kusnanto Indah Kurniawati Achmad Safi’i THERMAL EFFICIENCY ANALYSIS OF COMBUSTION TURBINE GENERATOR (821-G-101) PT TRANS PACIFIC PETROCHEMICAL INDOTAMA AFTER MAJOR INSPECTION Rekayasa Mesin thermal efficiency gas turbine major inspection |
title | THERMAL EFFICIENCY ANALYSIS OF COMBUSTION TURBINE GENERATOR (821-G-101) PT TRANS PACIFIC PETROCHEMICAL INDOTAMA AFTER MAJOR INSPECTION |
title_full | THERMAL EFFICIENCY ANALYSIS OF COMBUSTION TURBINE GENERATOR (821-G-101) PT TRANS PACIFIC PETROCHEMICAL INDOTAMA AFTER MAJOR INSPECTION |
title_fullStr | THERMAL EFFICIENCY ANALYSIS OF COMBUSTION TURBINE GENERATOR (821-G-101) PT TRANS PACIFIC PETROCHEMICAL INDOTAMA AFTER MAJOR INSPECTION |
title_full_unstemmed | THERMAL EFFICIENCY ANALYSIS OF COMBUSTION TURBINE GENERATOR (821-G-101) PT TRANS PACIFIC PETROCHEMICAL INDOTAMA AFTER MAJOR INSPECTION |
title_short | THERMAL EFFICIENCY ANALYSIS OF COMBUSTION TURBINE GENERATOR (821-G-101) PT TRANS PACIFIC PETROCHEMICAL INDOTAMA AFTER MAJOR INSPECTION |
title_sort | thermal efficiency analysis of combustion turbine generator 821 g 101 pt trans pacific petrochemical indotama after major inspection |
topic | thermal efficiency gas turbine major inspection |
url | https://rekayasamesin.ub.ac.id/index.php/rm/article/view/1664 |
work_keys_str_mv | AT moharifbatutah thermalefficiencyanalysisofcombustionturbinegenerator821g101pttranspacificpetrochemicalindotamaaftermajorinspection AT hadikusnanto thermalefficiencyanalysisofcombustionturbinegenerator821g101pttranspacificpetrochemicalindotamaaftermajorinspection AT indahkurniawati thermalefficiencyanalysisofcombustionturbinegenerator821g101pttranspacificpetrochemicalindotamaaftermajorinspection AT achmadsafii thermalefficiencyanalysisofcombustionturbinegenerator821g101pttranspacificpetrochemicalindotamaaftermajorinspection |