Coupled Hydrologic-Mechanical-Damage Analysis and Its Application to Diversion Tunnels of Hydropower Station
Since the traditional model cannot sufficiently reflect the multifield coupling problem, this paper established an elastoplastic stress-seepage-damage analysis model considering the seepage field, stress field, and damage field. Simultaneously, the elastoplastic damage model involves many parameters...
Saved in:
Main Authors: | Annan Jiang, Xiurong Yang, Mengfei Xu, Tengfei Jiang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/8341528 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Stability Monitoring and Analysis of High and Steep Slope of a Hydropower Station
by: Guangcheng Shi, et al.
Published: (2020-01-01) -
Path Transmissibility Analysis Considering Two Types of Correlations in Hydropower Stations
by: Baoping Zhi, et al.
Published: (2013-01-01) -
Prediction of BlastInduced Ground Vibration (BIGV) of Metro Construction Using Difference Evolution AlgorithmOptimized Gaussian Process (DE-GP)
by: Tengfei Jiang, et al.
Published: (2021-01-01) -
Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station
by: Gang Luo, et al.
Published: (2020-01-01) -
Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
by: Changjun Wang, et al.
Published: (2019-01-01)