Analysis of Cumulative Damage for Shared Rock in a Neighborhood Tunnel under Cyclic Blasting Loading Using the Ultrasonic Test
In blasting excavation of neighborhood tunnels, damage accumulation process in surrounding rock is inevitable. To explore the influence of damage accumulation of rock mass under multiple blasting loads, we analyzed the vibration damage accumulation process of ultrasonic wave velocity of rock mass in...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Shock and Vibration |
Online Access: | http://dx.doi.org/10.1155/2020/8810089 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832553286319734784 |
---|---|
author | Feng Cao Sheng Zhang Tonghua Ling |
author_facet | Feng Cao Sheng Zhang Tonghua Ling |
author_sort | Feng Cao |
collection | DOAJ |
description | In blasting excavation of neighborhood tunnels, damage accumulation process in surrounding rock is inevitable. To explore the influence of damage accumulation of rock mass under multiple blasting loads, we analyzed the vibration damage accumulation process of ultrasonic wave velocity of rock mass in shared rock of Liuyuetian neighborhood tunnel through ultrasonic test. Moreover, the effects of cyclic blasting loads on damage to the shared rock in the neighborhood tunnel were discussed and reported. The results demonstrate that the damage accumulation to the shared rock in the neighborhood tunnel is generated after multicycle progressive blasting operations. Influenced by cyclic blasting loads during the posterior excavating tunnel, the damage range of shared rock at the anterior excavating tunnel is 1.2 to 1.4 m, and the damage range of shared rock at the posterior excavating tunnel is 2.2 to 2.4 m. The damage range of shared rock in the posterior excavating tunnel is about 1.71 to 1.83 times that in the anterior excavating tunnel. Under blasting load, the stress concentration zone of shared rock is close to the blasting excavating face and is mainly within 2 m along the longitudinal axis of the tunnel. With continuous advancement of the blasting excavating face, the stress concentration zone moves forward continuously, and a striped stress concentration zone, which is approximately 2 m deep, is formed gradually. Thus, a method was proposed to determine the damage range of shared rock in the neighborhood tunnel during blasting excavation, as well as the variation law of damage. The experiences and conclusions presented can be used as references in the design and construction of similar engineering projects in the future. |
format | Article |
id | doaj-art-b2dd64b5e7ce48d9a7f81ba7b63086ba |
institution | Kabale University |
issn | 1070-9622 1875-9203 |
language | English |
publishDate | 2020-01-01 |
publisher | Wiley |
record_format | Article |
series | Shock and Vibration |
spelling | doaj-art-b2dd64b5e7ce48d9a7f81ba7b63086ba2025-02-03T05:54:25ZengWileyShock and Vibration1070-96221875-92032020-01-01202010.1155/2020/88100898810089Analysis of Cumulative Damage for Shared Rock in a Neighborhood Tunnel under Cyclic Blasting Loading Using the Ultrasonic TestFeng Cao0Sheng Zhang1Tonghua Ling2Hunan Provincial Communications Planning, Survey and Design Institute Company Limited, Changsha 410200, ChinaSchool of Civil Engineering, Hunan City University, Yiyang 413000, ChinaSchool of Civil Engineering, Changsha University of Science & Technology, Changsha 410114, ChinaIn blasting excavation of neighborhood tunnels, damage accumulation process in surrounding rock is inevitable. To explore the influence of damage accumulation of rock mass under multiple blasting loads, we analyzed the vibration damage accumulation process of ultrasonic wave velocity of rock mass in shared rock of Liuyuetian neighborhood tunnel through ultrasonic test. Moreover, the effects of cyclic blasting loads on damage to the shared rock in the neighborhood tunnel were discussed and reported. The results demonstrate that the damage accumulation to the shared rock in the neighborhood tunnel is generated after multicycle progressive blasting operations. Influenced by cyclic blasting loads during the posterior excavating tunnel, the damage range of shared rock at the anterior excavating tunnel is 1.2 to 1.4 m, and the damage range of shared rock at the posterior excavating tunnel is 2.2 to 2.4 m. The damage range of shared rock in the posterior excavating tunnel is about 1.71 to 1.83 times that in the anterior excavating tunnel. Under blasting load, the stress concentration zone of shared rock is close to the blasting excavating face and is mainly within 2 m along the longitudinal axis of the tunnel. With continuous advancement of the blasting excavating face, the stress concentration zone moves forward continuously, and a striped stress concentration zone, which is approximately 2 m deep, is formed gradually. Thus, a method was proposed to determine the damage range of shared rock in the neighborhood tunnel during blasting excavation, as well as the variation law of damage. The experiences and conclusions presented can be used as references in the design and construction of similar engineering projects in the future.http://dx.doi.org/10.1155/2020/8810089 |
spellingShingle | Feng Cao Sheng Zhang Tonghua Ling Analysis of Cumulative Damage for Shared Rock in a Neighborhood Tunnel under Cyclic Blasting Loading Using the Ultrasonic Test Shock and Vibration |
title | Analysis of Cumulative Damage for Shared Rock in a Neighborhood Tunnel under Cyclic Blasting Loading Using the Ultrasonic Test |
title_full | Analysis of Cumulative Damage for Shared Rock in a Neighborhood Tunnel under Cyclic Blasting Loading Using the Ultrasonic Test |
title_fullStr | Analysis of Cumulative Damage for Shared Rock in a Neighborhood Tunnel under Cyclic Blasting Loading Using the Ultrasonic Test |
title_full_unstemmed | Analysis of Cumulative Damage for Shared Rock in a Neighborhood Tunnel under Cyclic Blasting Loading Using the Ultrasonic Test |
title_short | Analysis of Cumulative Damage for Shared Rock in a Neighborhood Tunnel under Cyclic Blasting Loading Using the Ultrasonic Test |
title_sort | analysis of cumulative damage for shared rock in a neighborhood tunnel under cyclic blasting loading using the ultrasonic test |
url | http://dx.doi.org/10.1155/2020/8810089 |
work_keys_str_mv | AT fengcao analysisofcumulativedamageforsharedrockinaneighborhoodtunnelundercyclicblastingloadingusingtheultrasonictest AT shengzhang analysisofcumulativedamageforsharedrockinaneighborhoodtunnelundercyclicblastingloadingusingtheultrasonictest AT tonghualing analysisofcumulativedamageforsharedrockinaneighborhoodtunnelundercyclicblastingloadingusingtheultrasonictest |