Characteristics of Power Engineering Plant-1 (PEP-1)
The paper presents a new power engineering plant which is designed for desired obtaining important technological products from products of fuel combustion. The paper also considers an influence of regime factors on expenditure characteristics of Power Engineering Plant-1. Amount of the obtained tech...
Saved in:
Main Author: | N. V. Panteley |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2008-06-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/558 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Technical and Economic Advantages of Turbo-Drive Variant with TRB Turbines over Turbo-Generator Variant in Low Power Engineering
by: N. V. Panteley
Published: (2008-04-01) -
Identifying the Risky SNP of Osteoporosis with ID3-PEP Decision Tree Algorithm
by: Jincai Yang, et al.
Published: (2017-01-01) -
Pep2TCR: Accurate prediction of CD4 T cell receptor binding specificity through transfer learning and ensemble approach
by: Kaixuan Diao, et al.
Published: (2024-12-01) -
Anticancer effects of PEP06 (TB01) in combination with Trifluridine/Tipiracil (TAS-102) in a xenograft model of human colorectal cancer
by: Ruohong Lin, et al.
Published: (2024-12-01) -
Basic Principles for Elaboration of Technical Requirements to Control and Protective TRB Turbine Systems
by: N. V. Panteley
Published: (2007-08-01)