An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant
Critical types of infrastructure are provided by the state to maintain the people’s livelihood, ensure economic development, and systematic government operations. Given the development of ever more complicated critical infrastructure systems, increasing importance is being attached to the protection...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2021/5766855 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832552587156520960 |
---|---|
author | Huai-Wei Lo James J. H. Liou Jen-Jen Yang Chun-Nen Huang Yu-Hsuan Lu |
author_facet | Huai-Wei Lo James J. H. Liou Jen-Jen Yang Chun-Nen Huang Yu-Hsuan Lu |
author_sort | Huai-Wei Lo |
collection | DOAJ |
description | Critical types of infrastructure are provided by the state to maintain the people’s livelihood, ensure economic development, and systematic government operations. Given the development of ever more complicated critical infrastructure systems, increasing importance is being attached to the protection of the components of this infrastructure to reduce the risk of failure. Power facilities are one of the most important kinds of critical infrastructure. Developing an effective risk detection system to identify potential failure modes (FMs) of power supply equipment is crucial. This study seeks to improve upon prior approaches for risk assessment by proposing a hybrid risk-assessment model using the concepts of failure mode and effect analysis (FMEA) and multiple-criteria decision-making (MCDM). The proposed model includes a cost-based factor for decision-makers. The subjectivity and uncertainty in FM assessment are adjusted through the rough number method. The original risk priority number (RPN) can be expanded by including the entropy weights in the risk index. Furthermore, to rank the risk priorities in a rational manner, a modified technique for order preference by similarity to ideal solution (modified TOPSIS) is adopted. The applicability and effectiveness of the proposed method were demonstrated by considering an example of a turbine steam engine in a nuclear power plant. |
format | Article |
id | doaj-art-b0515f0e2e4c456ab50bf824bf162004 |
institution | Kabale University |
issn | 1099-0526 |
language | English |
publishDate | 2021-01-01 |
publisher | Wiley |
record_format | Article |
series | Complexity |
spelling | doaj-art-b0515f0e2e4c456ab50bf824bf1620042025-02-03T05:58:22ZengWileyComplexity1099-05262021-01-01202110.1155/2021/5766855An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power PlantHuai-Wei Lo0James J. H. Liou1Jen-Jen Yang2Chun-Nen Huang3Yu-Hsuan Lu4Department of Business AdministrationDepartment of Industrial Engineering and ManagementDepartment of Business AdministrationDepartment of Fire ScienceDepartment of Industrial Engineering and ManagementCritical types of infrastructure are provided by the state to maintain the people’s livelihood, ensure economic development, and systematic government operations. Given the development of ever more complicated critical infrastructure systems, increasing importance is being attached to the protection of the components of this infrastructure to reduce the risk of failure. Power facilities are one of the most important kinds of critical infrastructure. Developing an effective risk detection system to identify potential failure modes (FMs) of power supply equipment is crucial. This study seeks to improve upon prior approaches for risk assessment by proposing a hybrid risk-assessment model using the concepts of failure mode and effect analysis (FMEA) and multiple-criteria decision-making (MCDM). The proposed model includes a cost-based factor for decision-makers. The subjectivity and uncertainty in FM assessment are adjusted through the rough number method. The original risk priority number (RPN) can be expanded by including the entropy weights in the risk index. Furthermore, to rank the risk priorities in a rational manner, a modified technique for order preference by similarity to ideal solution (modified TOPSIS) is adopted. The applicability and effectiveness of the proposed method were demonstrated by considering an example of a turbine steam engine in a nuclear power plant.http://dx.doi.org/10.1155/2021/5766855 |
spellingShingle | Huai-Wei Lo James J. H. Liou Jen-Jen Yang Chun-Nen Huang Yu-Hsuan Lu An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant Complexity |
title | An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant |
title_full | An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant |
title_fullStr | An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant |
title_full_unstemmed | An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant |
title_short | An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant |
title_sort | extended fmea model for exploring the potential failure modes a case study of a steam turbine for a nuclear power plant |
url | http://dx.doi.org/10.1155/2021/5766855 |
work_keys_str_mv | AT huaiweilo anextendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant AT jamesjhliou anextendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant AT jenjenyang anextendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant AT chunnenhuang anextendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant AT yuhsuanlu anextendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant AT huaiweilo extendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant AT jamesjhliou extendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant AT jenjenyang extendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant AT chunnenhuang extendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant AT yuhsuanlu extendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant |