An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant

Critical types of infrastructure are provided by the state to maintain the people’s livelihood, ensure economic development, and systematic government operations. Given the development of ever more complicated critical infrastructure systems, increasing importance is being attached to the protection...

Full description

Saved in:
Bibliographic Details
Main Authors: Huai-Wei Lo, James J. H. Liou, Jen-Jen Yang, Chun-Nen Huang, Yu-Hsuan Lu
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Complexity
Online Access:http://dx.doi.org/10.1155/2021/5766855
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832552587156520960
author Huai-Wei Lo
James J. H. Liou
Jen-Jen Yang
Chun-Nen Huang
Yu-Hsuan Lu
author_facet Huai-Wei Lo
James J. H. Liou
Jen-Jen Yang
Chun-Nen Huang
Yu-Hsuan Lu
author_sort Huai-Wei Lo
collection DOAJ
description Critical types of infrastructure are provided by the state to maintain the people’s livelihood, ensure economic development, and systematic government operations. Given the development of ever more complicated critical infrastructure systems, increasing importance is being attached to the protection of the components of this infrastructure to reduce the risk of failure. Power facilities are one of the most important kinds of critical infrastructure. Developing an effective risk detection system to identify potential failure modes (FMs) of power supply equipment is crucial. This study seeks to improve upon prior approaches for risk assessment by proposing a hybrid risk-assessment model using the concepts of failure mode and effect analysis (FMEA) and multiple-criteria decision-making (MCDM). The proposed model includes a cost-based factor for decision-makers. The subjectivity and uncertainty in FM assessment are adjusted through the rough number method. The original risk priority number (RPN) can be expanded by including the entropy weights in the risk index. Furthermore, to rank the risk priorities in a rational manner, a modified technique for order preference by similarity to ideal solution (modified TOPSIS) is adopted. The applicability and effectiveness of the proposed method were demonstrated by considering an example of a turbine steam engine in a nuclear power plant.
format Article
id doaj-art-b0515f0e2e4c456ab50bf824bf162004
institution Kabale University
issn 1099-0526
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Complexity
spelling doaj-art-b0515f0e2e4c456ab50bf824bf1620042025-02-03T05:58:22ZengWileyComplexity1099-05262021-01-01202110.1155/2021/5766855An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power PlantHuai-Wei Lo0James J. H. Liou1Jen-Jen Yang2Chun-Nen Huang3Yu-Hsuan Lu4Department of Business AdministrationDepartment of Industrial Engineering and ManagementDepartment of Business AdministrationDepartment of Fire ScienceDepartment of Industrial Engineering and ManagementCritical types of infrastructure are provided by the state to maintain the people’s livelihood, ensure economic development, and systematic government operations. Given the development of ever more complicated critical infrastructure systems, increasing importance is being attached to the protection of the components of this infrastructure to reduce the risk of failure. Power facilities are one of the most important kinds of critical infrastructure. Developing an effective risk detection system to identify potential failure modes (FMs) of power supply equipment is crucial. This study seeks to improve upon prior approaches for risk assessment by proposing a hybrid risk-assessment model using the concepts of failure mode and effect analysis (FMEA) and multiple-criteria decision-making (MCDM). The proposed model includes a cost-based factor for decision-makers. The subjectivity and uncertainty in FM assessment are adjusted through the rough number method. The original risk priority number (RPN) can be expanded by including the entropy weights in the risk index. Furthermore, to rank the risk priorities in a rational manner, a modified technique for order preference by similarity to ideal solution (modified TOPSIS) is adopted. The applicability and effectiveness of the proposed method were demonstrated by considering an example of a turbine steam engine in a nuclear power plant.http://dx.doi.org/10.1155/2021/5766855
spellingShingle Huai-Wei Lo
James J. H. Liou
Jen-Jen Yang
Chun-Nen Huang
Yu-Hsuan Lu
An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant
Complexity
title An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant
title_full An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant
title_fullStr An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant
title_full_unstemmed An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant
title_short An Extended FMEA Model for Exploring the Potential Failure Modes: A Case Study of a Steam Turbine for a Nuclear Power Plant
title_sort extended fmea model for exploring the potential failure modes a case study of a steam turbine for a nuclear power plant
url http://dx.doi.org/10.1155/2021/5766855
work_keys_str_mv AT huaiweilo anextendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant
AT jamesjhliou anextendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant
AT jenjenyang anextendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant
AT chunnenhuang anextendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant
AT yuhsuanlu anextendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant
AT huaiweilo extendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant
AT jamesjhliou extendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant
AT jenjenyang extendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant
AT chunnenhuang extendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant
AT yuhsuanlu extendedfmeamodelforexploringthepotentialfailuremodesacasestudyofasteamturbineforanuclearpowerplant