The Best Estimate Plus Uncertainty Challenge in the Current Licensing Process of Present Reactors
Within the licensing process of the KWU Atucha II PHWR (Pressurized Heavy Water Reactor), the BEPU (Best Estimate Plus Uncertainty) approach has been selected for issuing of the Chapter 15 on FSAR (Final Safety Analysis Report). The key steps of the entire process are basically two: (a) the selectio...
Saved in:
Main Authors: | Francesco D'Auria, Oscar Mazzantini |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2011-01-01
|
Series: | Science and Technology of Nuclear Installations |
Online Access: | http://dx.doi.org/10.1155/2011/958218 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Best-Estimate Plus Uncertainty Framework for Multiscale, Multiphysics Light Water Reactor Core Analysis
by: Jason Hou, et al.
Published: (2020-01-01) -
Thermal-Hydraulic System Codes in Nulcear Reactor Safety and Qualification Procedures
by: Alessandro Petruzzi, et al.
Published: (2008-01-01) -
International Course to Support Nuclear Licensing by User Training in the Areas of Scaling, Uncertainty, and 3D Thermal-Hydraulics/Neutron-Kinetics Coupled Codes: 3D S.UN.COP Seminars
by: Alessandro Petruzzi, et al.
Published: (2008-01-01) -
Development and Application of MCNP5 and KENO-VI Monte Carlo Models for the Atucha-2 PHWR Analysis
by: M. Pecchia, et al.
Published: (2011-01-01) -
Incorporating preference uncertainty in best worst scaling.
by: Francisco J Areal, et al.
Published: (2025-01-01)