The Best Estimate Plus Uncertainty Challenge in the Current Licensing Process of Present Reactors

Within the licensing process of the KWU Atucha II PHWR (Pressurized Heavy Water Reactor), the BEPU (Best Estimate Plus Uncertainty) approach has been selected for issuing of the Chapter 15 on FSAR (Final Safety Analysis Report). The key steps of the entire process are basically two: (a) the selectio...

Full description

Saved in:
Bibliographic Details
Main Authors: Francesco D'Auria, Oscar Mazzantini
Format: Article
Language:English
Published: Wiley 2011-01-01
Series:Science and Technology of Nuclear Installations
Online Access:http://dx.doi.org/10.1155/2011/958218
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Within the licensing process of the KWU Atucha II PHWR (Pressurized Heavy Water Reactor), the BEPU (Best Estimate Plus Uncertainty) approach has been selected for issuing of the Chapter 15 on FSAR (Final Safety Analysis Report). The key steps of the entire process are basically two: (a) the selection of PIE (Postulated Initiating Events) and (b) the analysis by best estimate models supported by uncertainty evaluation. Otherwise, key elements of the approach are (1) availability of qualified computational tools including suitable uncertainty method, (2) demonstration of quality, and (3) acceptability and endorsement by the licensing authority. The effort of issuing Chapter 15 is terminated at the time of issuing of the present paper, and the safety margins available for the operation of the concerned NPP (Nuclear Power Plant) have been quantified.
ISSN:1687-6075
1687-6083