Uncertainty and Sensitivity Analysis of Significant Parameters for Superlarge Diameter Shield Excavation
Excavation of a superlarge diameter tunnel by tunnel boring machine (TBM) is different from that of a shield tunnel with normal dimension, in which the control system of the superlarge TBM is very complicated and difficult to operate. Hence, it is very important to focus on the control and managemen...
Saved in:
Main Authors: | Elton J. Chen, Yang-Yang Chen, Lin-Chun Wei, Han-Bin Luo |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/8819393 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on the Influence of Excavation of Superlarge and Ultra-Deep Foundation Pits on the Pile Foundation of Existing Viaducts
by: Wancai Zhong, et al.
Published: (2023-01-01) -
Scheme Exploration and Performance Analysis of 800-Meter Superlarge Span Structure
by: Deshen Chen, et al.
Published: (2018-01-01) -
Study on Settlement Influence of Newly Excavated Tunnel Undercrossing Large Diameter Pipeline
by: Qian Xu, et al.
Published: (2022-01-01) -
Bubble Departure Diameter Prediction Uncertainty
by: Marko Matkovič, et al.
Published: (2012-01-01) -
Analysis of Face Stability during Excavation of Double-O-Tube Shield Tunnel
by: Yuyou Yang, et al.
Published: (2013-01-01)