Penyebab Keterlambatan Konstruksi Proyek Jalan Kota Di Provinsi Sumatera Barat
The success of a construction project is determined by the suitability of time, cost and quality specified in the contract documents. However, construction project implementation sometimes experiences delays caused by various factors. Road projects are one of the construction projects that often exp...
Saved in:
| Main Authors: | Taufika Ophiyandri, Rika Ampuh Hadiguna, Dea Honesti |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Andalas
2023-08-01
|
| Series: | Jurnal Bangunan, Konstruksi & Desain |
| Subjects: | |
| Online Access: | https://jbkd.ft.unand.ac.id/index.php/jbkd/article/view/16 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimasi Pemeliharaan Jalan: Model Pengambilan Keputusan Multi-Kriteria untuk Prioritas di Kabupaten Pasaman, Sumatera Barat
Published: (2024-12-01) -
Prediksi Dampak Pembangunan Jalan Tol Trans Sumatera Pada Permintaan Perjalanan Udara Antar Provinsi di Pulau Sumatera
by: Andry Yuliyanto, et al.
Published: (2024-10-01) -
Analisa Risiko Penyebab Keterlambatan pada Proyek Konstruksi Pabrik Pupuk di Kabupaten Gresik Dengan Metode Pohon Kesalahan
by: AVISHA GITA PRAFITASIWI, et al.
Published: (2024-10-01) -
UJI KOMPARASI PERENCANAAN TEBAL PERKERASAN LENTUR DAN KAKU METODE AASHTO 1993 (STUDI KASUS PROYEK KBK PENINGKATAN JALAN NASIONAL BANYUMANIK BAWEN)
by: Totok Apriyatno
Published: (2015-01-01) -
Kajian Eksploratori Hubungan Praktik Komunikasi dan Hasil Proyek Konstruksi di Sumatera Barat
by: Wahyudi P. Utama, et al.
Published: (2024-08-01)