Construction and Capacity Analysis of High-Rank LoS MIMO Channels in High Speed Railway Scenarios
The validity of the maximum capacity criterion applied to realize high-rank line-of-sight (LoS) multiple-input multiple-output (MIMO) channels is investigated for high speed railway scenarios. Performance is evaluated by ergodic capacity. Numerical results demonstrate that by simply adjusting antenn...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2012-01-01
|
Series: | International Journal of Antennas and Propagation |
Online Access: | http://dx.doi.org/10.1155/2012/423759 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832551824354181120 |
---|---|
author | Jingya Yang Bo Ai Zhangdui Zhong |
author_facet | Jingya Yang Bo Ai Zhangdui Zhong |
author_sort | Jingya Yang |
collection | DOAJ |
description | The validity of the maximum capacity criterion applied to realize high-rank line-of-sight (LoS) multiple-input multiple-output (MIMO) channels is investigated for high speed railway scenarios. Performance is evaluated by ergodic capacity. Numerical results demonstrate that by simply adjusting antenna spacing according to the maximum capacity criterion, significant capacity gains are achievable. We find relatively low sensitivity of the system to displacements from the optimal point and angle in relatively short range. Thus, we present two proposals to reconfigure antenna arrays so as to maximize LoS MIMO capacity in the high speed railway scenarios |
format | Article |
id | doaj-art-a60ece31f028476ebf35dd1017ccf33a |
institution | Kabale University |
issn | 1687-5869 1687-5877 |
language | English |
publishDate | 2012-01-01 |
publisher | Wiley |
record_format | Article |
series | International Journal of Antennas and Propagation |
spelling | doaj-art-a60ece31f028476ebf35dd1017ccf33a2025-02-03T06:00:31ZengWileyInternational Journal of Antennas and Propagation1687-58691687-58772012-01-01201210.1155/2012/423759423759Construction and Capacity Analysis of High-Rank LoS MIMO Channels in High Speed Railway ScenariosJingya Yang0Bo Ai1Zhangdui Zhong2State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaState Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaState Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, ChinaThe validity of the maximum capacity criterion applied to realize high-rank line-of-sight (LoS) multiple-input multiple-output (MIMO) channels is investigated for high speed railway scenarios. Performance is evaluated by ergodic capacity. Numerical results demonstrate that by simply adjusting antenna spacing according to the maximum capacity criterion, significant capacity gains are achievable. We find relatively low sensitivity of the system to displacements from the optimal point and angle in relatively short range. Thus, we present two proposals to reconfigure antenna arrays so as to maximize LoS MIMO capacity in the high speed railway scenarioshttp://dx.doi.org/10.1155/2012/423759 |
spellingShingle | Jingya Yang Bo Ai Zhangdui Zhong Construction and Capacity Analysis of High-Rank LoS MIMO Channels in High Speed Railway Scenarios International Journal of Antennas and Propagation |
title | Construction and Capacity Analysis of High-Rank LoS MIMO Channels in High Speed Railway Scenarios |
title_full | Construction and Capacity Analysis of High-Rank LoS MIMO Channels in High Speed Railway Scenarios |
title_fullStr | Construction and Capacity Analysis of High-Rank LoS MIMO Channels in High Speed Railway Scenarios |
title_full_unstemmed | Construction and Capacity Analysis of High-Rank LoS MIMO Channels in High Speed Railway Scenarios |
title_short | Construction and Capacity Analysis of High-Rank LoS MIMO Channels in High Speed Railway Scenarios |
title_sort | construction and capacity analysis of high rank los mimo channels in high speed railway scenarios |
url | http://dx.doi.org/10.1155/2012/423759 |
work_keys_str_mv | AT jingyayang constructionandcapacityanalysisofhighranklosmimochannelsinhighspeedrailwayscenarios AT boai constructionandcapacityanalysisofhighranklosmimochannelsinhighspeedrailwayscenarios AT zhangduizhong constructionandcapacityanalysisofhighranklosmimochannelsinhighspeedrailwayscenarios |