Scheduling with the Probabilistic Coupling Method II (PTCM II) – assuming continuity of work on the working sectors
Effective planning is crucial in the construction sector to ensure projects are completed on time and on budget. However, the construction industry faces various challenges that can complicate the planning process. There are often delays, exceedances of the baseline and increases in investment costs...
Saved in:
| Main Authors: | Paulina Kostrzewa-Demczuk, Magdalena Rogalska |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Polish Academy of Sciences
2024-12-01
|
| Series: | Archives of Civil Engineering |
| Subjects: | |
| Online Access: | https://journals.pan.pl/Content/133482/31_1k.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Hierarchical Charging Scheduling Strategy for Electric Vehicles Based on NSGA-II
by: Yikang Chen, et al.
Published: (2025-06-01) -
Effective NSGA-II Algorithm for a Limited AGV Scheduling Problem in Matrix Manufacturing Workshops with Undirected Material Flow
by: Xuewu Wang, et al.
Published: (2025-03-01) -
Optimization of ore production scheduling strategy using NSGA-II-GRA in open-pit mining
by: ZhongQiang Chen, et al.
Published: (2025-03-01) -
Program Scheduling With Multi-Skill and External Resource Coordination Consideration Using Improved NSGA-II: Case Study
by: Heng Zhang, et al.
Published: (2024-01-01) -
Synthesis and characterization of Pd(II) and Pt(II) complexes containing mixed ligands of thione and diamine
by: Ahmed S. M. Al-Janabi
Published: (2023-02-01)