SAV Operations on a Bus Line Corridor: Travel Demand, Service Frequency, and Vehicle Size

Before shared automated vehicles (SAVs) can be widely adopted, they are anticipated to be implemented commercially in confined regions or fixed routes where the benefits of automation can be realized. SAVs have the potential to operate in a traditional transit corridor, replacing conventional transi...

Full description

Saved in:
Bibliographic Details
Main Authors: Huang Yantao, Kara M. Kockelman, Long T. Truong
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Journal of Advanced Transportation
Online Access:http://dx.doi.org/10.1155/2021/5577500
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832565252707844096
author Huang Yantao
Kara M. Kockelman
Long T. Truong
author_facet Huang Yantao
Kara M. Kockelman
Long T. Truong
author_sort Huang Yantao
collection DOAJ
description Before shared automated vehicles (SAVs) can be widely adopted, they are anticipated to be implemented commercially in confined regions or fixed routes where the benefits of automation can be realized. SAVs have the potential to operate in a traditional transit corridor, replacing conventional transit vehicles, and have frequent interactions with riders and other vehicles sharing the same right of way. This paper microsimulates SAVs’ operation on a 6.5-mile corridor to understand how vehicle size and attributes of such SAV-based transit affect traffic, transit riders, and system costs. The SUMO (Simulation of Urban MObility) platform is employed to model microscopic interactions among SAVs, transit passengers, and other traffic. Results show that the use of smaller, but more frequent, SAVs leads to reduced passenger waiting times but increased vehicle travel times. More frequent services of smaller SAVs do not, in general, significantly affect general traffic due to shorter dwell times. Overall, using smaller SAVs instead of the large 40-seat SAVs can reduce system costs by up to 4% while also reducing passenger waiting times, under various demand levels and passenger loading factors. However, the use of 5-seat SAVs does not always have the lowest system costs.
format Article
id doaj-art-a5235f0fa8774a31827e15f564781ac7
institution Kabale University
issn 0197-6729
2042-3195
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Journal of Advanced Transportation
spelling doaj-art-a5235f0fa8774a31827e15f564781ac72025-02-03T01:08:52ZengWileyJournal of Advanced Transportation0197-67292042-31952021-01-01202110.1155/2021/55775005577500SAV Operations on a Bus Line Corridor: Travel Demand, Service Frequency, and Vehicle SizeHuang Yantao0Kara M. Kockelman1Long T. Truong2Department of Civil, Architectural and Environmental Engineering, The University of Texas, Austin, TX, USADepartment of Civil, Architectural and Environmental Engineering, The University of Texas, Austin, TX, USADepartment of Engineering, La Trobe University, Melbourne, AustraliaBefore shared automated vehicles (SAVs) can be widely adopted, they are anticipated to be implemented commercially in confined regions or fixed routes where the benefits of automation can be realized. SAVs have the potential to operate in a traditional transit corridor, replacing conventional transit vehicles, and have frequent interactions with riders and other vehicles sharing the same right of way. This paper microsimulates SAVs’ operation on a 6.5-mile corridor to understand how vehicle size and attributes of such SAV-based transit affect traffic, transit riders, and system costs. The SUMO (Simulation of Urban MObility) platform is employed to model microscopic interactions among SAVs, transit passengers, and other traffic. Results show that the use of smaller, but more frequent, SAVs leads to reduced passenger waiting times but increased vehicle travel times. More frequent services of smaller SAVs do not, in general, significantly affect general traffic due to shorter dwell times. Overall, using smaller SAVs instead of the large 40-seat SAVs can reduce system costs by up to 4% while also reducing passenger waiting times, under various demand levels and passenger loading factors. However, the use of 5-seat SAVs does not always have the lowest system costs.http://dx.doi.org/10.1155/2021/5577500
spellingShingle Huang Yantao
Kara M. Kockelman
Long T. Truong
SAV Operations on a Bus Line Corridor: Travel Demand, Service Frequency, and Vehicle Size
Journal of Advanced Transportation
title SAV Operations on a Bus Line Corridor: Travel Demand, Service Frequency, and Vehicle Size
title_full SAV Operations on a Bus Line Corridor: Travel Demand, Service Frequency, and Vehicle Size
title_fullStr SAV Operations on a Bus Line Corridor: Travel Demand, Service Frequency, and Vehicle Size
title_full_unstemmed SAV Operations on a Bus Line Corridor: Travel Demand, Service Frequency, and Vehicle Size
title_short SAV Operations on a Bus Line Corridor: Travel Demand, Service Frequency, and Vehicle Size
title_sort sav operations on a bus line corridor travel demand service frequency and vehicle size
url http://dx.doi.org/10.1155/2021/5577500
work_keys_str_mv AT huangyantao savoperationsonabuslinecorridortraveldemandservicefrequencyandvehiclesize
AT karamkockelman savoperationsonabuslinecorridortraveldemandservicefrequencyandvehiclesize
AT longttruong savoperationsonabuslinecorridortraveldemandservicefrequencyandvehiclesize