Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction”
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/9481728 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832554681265553408 |
---|---|
author | Changsheng Wu Zhiduo Zhu |
author_facet | Changsheng Wu Zhiduo Zhu |
author_sort | Changsheng Wu |
collection | DOAJ |
format | Article |
id | doaj-art-a467b3ecf1034eb08935d3e1a70a99b0 |
institution | Kabale University |
issn | 1687-8086 1687-8094 |
language | English |
publishDate | 2019-01-01 |
publisher | Wiley |
record_format | Article |
series | Advances in Civil Engineering |
spelling | doaj-art-a467b3ecf1034eb08935d3e1a70a99b02025-02-03T05:50:52ZengWileyAdvances in Civil Engineering1687-80861687-80942019-01-01201910.1155/2019/94817289481728Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction”Changsheng Wu0Zhiduo Zhu1Institute of Geotechnical Engineering, Southeast University, Nanjing 210096, ChinaInstitute of Geotechnical Engineering, Southeast University, Nanjing 210096, Chinahttp://dx.doi.org/10.1155/2019/9481728 |
spellingShingle | Changsheng Wu Zhiduo Zhu Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” Advances in Civil Engineering |
title | Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” |
title_full | Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” |
title_fullStr | Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” |
title_full_unstemmed | Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” |
title_short | Corrigendum to “Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction” |
title_sort | corrigendum to analytical method for evaluating the ground surface settlement caused by tail void grouting pressure in shield tunnel construction |
url | http://dx.doi.org/10.1155/2019/9481728 |
work_keys_str_mv | AT changshengwu corrigendumtoanalyticalmethodforevaluatingthegroundsurfacesettlementcausedbytailvoidgroutingpressureinshieldtunnelconstruction AT zhiduozhu corrigendumtoanalyticalmethodforevaluatingthegroundsurfacesettlementcausedbytailvoidgroutingpressureinshieldtunnelconstruction |