Analysis of Settlement Induced by Shield Construction of the Metro Passing under Existing Buildings Based on the Finite Difference Method
A frequent problem when constructing metro tunnels is the uneven settlement of adjacent buildings, which results in huge economic losses. Due to shields causing the settlement of adjacent buildings, this study took the Nantong Metro Line 1 as the research object. The metro runs from the East Huanche...
Saved in:
Main Authors: | Rui Wang, Bin Zhang, You Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Geofluids |
Online Access: | http://dx.doi.org/10.1155/2022/1206867 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction
by: Yong Xu, et al.
Published: (2022-01-01) -
Structural Monitoring of Metro Infrastructure during Shield Tunneling Construction
by: L. Ran, et al.
Published: (2014-01-01) -
Deformation Characterisation and Distress Diagnosis of a Metro Shield Tunnel by Adjacent Constructions
by: Ting-jin Liu, et al.
Published: (2020-01-01) -
Corrigendum to “Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an”
by: Heng Li, et al.
Published: (2021-01-01) -
Study on Deformation Law of Subway Construction under Passing Existing Line in Short Distance
by: Cong-Shuang Luo, et al.
Published: (2021-01-01)