Model and Algorithm for Dependent Activity Schedule Optimization Combining with BIM
The project duration can be shortened by overlapping construction activities. However, the continuous changing of the environment tends to cause problems such as rework and the failure of the overlapping plan. In order to solve these problems, communication strategies for the overlapping of dependen...
Saved in:
Main Authors: | Guofeng Ma, Xiaoye Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/9727256 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization for Due-Window Assignment Scheduling with Position-Dependent Weights
by: Li-Yan Wang, et al.
Published: (2020-01-01) -
Optimal Scheduling of Microgrids Based on an Improved Dung Beetle Optimization Algorithm
by: Yuntao Yue, et al.
Published: (2025-01-01) -
BIM Adoption and Its Impact on Planning and Scheduling Influencing Mega Plan Projects- (CPEC-) Quantitative Approach
by: Ahsan Nawaz, et al.
Published: (2021-01-01) -
A hybrid particle swarm optimization algorithm for single machine scheduling with sequence-dependent setup times and learning effects
by: Payam Chiniforooshan, et al.
Published: (2023-06-01) -
Discrete Bat Algorithm for Optimal Problem of Permutation Flow Shop Scheduling
by: Qifang Luo, et al.
Published: (2014-01-01)