Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry

The J.P. Magufuli extradosed bridge is currently under construction. This bridge crossing Lake Victoria has an overall length of 3,000 m and a deck width of 28.45 m to accommodate 4 lanes of 3.5 m wide carriageways of vehicular traffic, a shoulder of 2.5 m+2.5 m for emergency parking and vehicle bre...

Full description

Saved in:
Bibliographic Details
Main Author: Katelula Salum Kaswaga
Format: Article
Language:English
Published: Editorial Department of Progress in Prestress Technology, Tongji University 2025-06-01
Series:预应力技术
Subjects:
Online Access:https://ptmc.tongji.edu.cn/yyljs/article/pdf/202502005
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849684158683545600
author Katelula Salum Kaswaga
author_facet Katelula Salum Kaswaga
author_sort Katelula Salum Kaswaga
collection DOAJ
description The J.P. Magufuli extradosed bridge is currently under construction. This bridge crossing Lake Victoria has an overall length of 3,000 m and a deck width of 28.45 m to accommodate 4 lanes of 3.5 m wide carriageways of vehicular traffic, a shoulder of 2.5 m+2.5 m for emergency parking and vehicle breakdown on each side, a 2.5 m+2.5 m footpath for pedestrians on each side, and a median of 2.45 m. The structural arrangement of the main bridge is 100 m+160 m + 160 m+100 m = 520 m, and the approach bridge prestressed concrete (PSC) beam bridge L = 2,480 m (including 31@40=1,240 m on each side). The superstructure is an extradosed bridge with an RCC deck with three RCC pylons 18.856 m in height. The girder heights at the mid-span and end-span are 5.4 m and 3.2 m, respectively. This paper discusses the construction aspects of the J.P. Magufuli bridge along with the details of a special traveling formwork (Form-Traveller) that is used to enable balanced cantilever construction, Pylons, PC House construction for the Pile Cap, and Deck Slab Partial Depth Panel for Deck Slab Construction.
format Article
id doaj-art-a22de9ef818c4c68afe6ac2c6d4a593c
institution DOAJ
issn 2521-9480
language English
publishDate 2025-06-01
publisher Editorial Department of Progress in Prestress Technology, Tongji University
record_format Article
series 预应力技术
spelling doaj-art-a22de9ef818c4c68afe6ac2c6d4a593c2025-08-20T03:23:34ZengEditorial Department of Progress in Prestress Technology, Tongji University预应力技术2521-94802025-06-0132546810.59238/j.pt.2025.02.005Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi FerryKatelula Salum KaswagaThe J.P. Magufuli extradosed bridge is currently under construction. This bridge crossing Lake Victoria has an overall length of 3,000 m and a deck width of 28.45 m to accommodate 4 lanes of 3.5 m wide carriageways of vehicular traffic, a shoulder of 2.5 m+2.5 m for emergency parking and vehicle breakdown on each side, a 2.5 m+2.5 m footpath for pedestrians on each side, and a median of 2.45 m. The structural arrangement of the main bridge is 100 m+160 m + 160 m+100 m = 520 m, and the approach bridge prestressed concrete (PSC) beam bridge L = 2,480 m (including 31@40=1,240 m on each side). The superstructure is an extradosed bridge with an RCC deck with three RCC pylons 18.856 m in height. The girder heights at the mid-span and end-span are 5.4 m and 3.2 m, respectively. This paper discusses the construction aspects of the J.P. Magufuli bridge along with the details of a special traveling formwork (Form-Traveller) that is used to enable balanced cantilever construction, Pylons, PC House construction for the Pile Cap, and Deck Slab Partial Depth Panel for Deck Slab Construction.https://ptmc.tongji.edu.cn/yyljs/article/pdf/202502005 extradosed bridge cantilever construction travelling formwork climbing formwork deck slab panel pc house pile cap pylons
spellingShingle Katelula Salum Kaswaga
Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry
预应力技术
extradosed bridge
cantilever construction
travelling formwork
climbing formwork
deck slab panel
pc house
pile cap
pylons
title Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry
title_full Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry
title_fullStr Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry
title_full_unstemmed Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry
title_short Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry
title_sort construction of j p magufuli extradosed cable stayed bridge 3 0 km at mwanza tanzania near kigongo busisi ferry
topic extradosed bridge
cantilever construction
travelling formwork
climbing formwork
deck slab panel
pc house
pile cap
pylons
url https://ptmc.tongji.edu.cn/yyljs/article/pdf/202502005
work_keys_str_mv AT katelulasalumkaswaga constructionofjpmagufuliextradosedcablestayedbridge30kmatmwanzatanzanianearkigongobusisiferry