Power-Generating Units of New Generation for Peak Mini-Power Complexes
The paper considers a load diagram leveling as of one of the means for higher operational efficiency of a power system and power saving. In order to reach the target it is supposed to use peak devices of the distributed generation (peak mini-power complexes) on the basis of cutting edge power equipm...
Saved in:
Main Author: | S. V. Konstantinova |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2012-02-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/237 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Efficiency of Using the Auxiliary Boiler for Peak Power Generation by a Steam Turbine of NPP
by: V. A. Khrustalev, et al.
Published: (2021-02-01) -
Application of Unit Commitment with Market Pool in a Peaking Power Generation Firm in the Philippines for a Cost Reduction Case Study
by: Luke Rey Santillan, et al.
Published: (2016-01-01) -
Capacity optimization of photovoltaic storage hydrogen power generation system with peak shaving and frequency regulation
by: Dan Yu, et al.
Published: (2025-01-01) -
QUALITY EVALUATION OF THE TPP POWER GENERATING UNITS WEAR RECONDITIONING
by: E. M. Farhadzadeh, et al.
Published: (2016-02-01) -
Solar Power Generation
by: K. S. Reddy, et al.
Published: (2013-01-01)