Solving the Problem of Time, Cost, and Quality Trade-Off in Project Scheduling under Fuzzy Conditions Using Meta-Heuristic Algorithms
Balancing the project’s time, cost, and quality involves deciding on different implementation methods for each project activity. Time and cost are minimized simultaneously, and the quality of the final product or service is maximized. Indeed, the use of search methods to determine the optimal execut...
Saved in:
Main Authors: | Hojjatullah Ghadir, Seyed Ahmad Shayannia, Mehdi Amir Miandargh |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2022/6401061 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Robust Proactive Project Scheduling Model for the Stochastic Discrete Time/Cost Trade-Off Problem
by: Hongbo Li, et al.
Published: (2015-01-01) -
Fuzzy Multicriteria Decision-Making Model for Time-Cost-Risk Trade-Off Optimization in Construction Projects
by: M. Ammar Alzarrad, et al.
Published: (2019-01-01) -
Integrated Design of Cellular Production System Using Branch and Bound Algorithm
by: Roohallah Ranjbar, et al.
Published: (2022-01-01) -
Optimizing Competency-Based Human Resource Allocation in Construction Project Scheduling: A Multi-Objective Meta-Heuristic Approach
by: Bahman Shojaei, et al.
Published: (2024-09-01) -
Project Scheduling Heuristics-Based Standard PSO for Task-Resource Assignment in Heterogeneous Grid
by: Ruey-Maw Chen, et al.
Published: (2011-01-01)