Optimization of re-profiling strategy for retirement upon completion of advanced repair period for EMU wheels
This paper evaluates the economic benefits of EMU wheels upon the completion of their advanced repair periods and optimizes the re-profiling strategy based on actual application data to enhance the efficiency and cost-effectiveness of maintenance management. Through in-depth data analysis of economi...
Saved in:
| Main Authors: | LIU Lingcong, SONG Dongli, ZHANG Weihua |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Department of Electric Drive for Locomotives
2024-09-01
|
| Series: | 机车电传动 |
| Subjects: | |
| Online Access: | http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128X.2024.05.022 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Feasibility Study of CRH380B EMU Wheel Set Advanced-reprofiling on the Optimization of the Limit of Flange Thickness
by: Xu TANG, et al.
Published: (2021-05-01) -
Research on numerical simulation method for degradation of whole-train wheels of EMU in full-process O&M
by: CHEN Boqing, et al.
Published: (2023-03-01) -
Investigation on influencing factors of wheel polygonization of a plateau high-speed EMU train
by: Wei Li, et al.
Published: (2024-10-01) -
Research on Residual Life of IGBT Module on EMU in Advanced Repair Based on Power Cycles
by: JIANG Jie, et al.
Published: (2023-04-01) -
Analysis and Prediction on the Current Situation of the Repair Class and Repair System of Electric Multiple Units (EMU)
by: ZHOU Bin, et al.
Published: (2017-01-01)