Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera Barat

In this research, development of a pico hydro power plant utilizing the river with water flow 0.6 m<sup>3</sup>/s and head 1.5 m is conducted. According to the available potential of the area, the waterwheel turbine with type undershot and efficiency about 71-76% is selected. The synchro...

Full description

Saved in:
Bibliographic Details
Main Authors: Adly Havendri, Dendi Adi Saputra, Mulya Cipta Nurmansyah
Format: Article
Language:English
Published: Department of Mechanical Engineering, Faculty of Engineering, Universitas Andalas 2017-08-01
Series:Metal: Jurnal Sistem Mekanik dan Termal
Online Access:https://metal.ft.unand.ac.id/index.php/metal/article/view/4
Tags: Add Tag
No Tags, Be the first to tag this record!