Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera Barat
In this research, development of a pico hydro power plant utilizing the river with water flow 0.6 m<sup>3</sup>/s and head 1.5 m is conducted. According to the available potential of the area, the waterwheel turbine with type undershot and efficiency about 71-76% is selected. The synchro...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Department of Mechanical Engineering, Faculty of Engineering, Universitas Andalas
2017-08-01
|
Series: | Metal: Jurnal Sistem Mekanik dan Termal |
Online Access: | https://metal.ft.unand.ac.id/index.php/metal/article/view/4 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!