Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera Barat

In this research, development of a pico hydro power plant utilizing the river with water flow 0.6 m<sup>3</sup>/s and head 1.5 m is conducted. According to the available potential of the area, the waterwheel turbine with type undershot and efficiency about 71-76% is selected. The synchro...

Full description

Saved in:
Bibliographic Details
Main Authors: Adly Havendri, Dendi Adi Saputra, Mulya Cipta Nurmansyah
Format: Article
Language:English
Published: Department of Mechanical Engineering, Faculty of Engineering, Universitas Andalas 2017-08-01
Series:Metal: Jurnal Sistem Mekanik dan Termal
Online Access:https://metal.ft.unand.ac.id/index.php/metal/article/view/4
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832574966482075648
author Adly Havendri
Dendi Adi Saputra
Mulya Cipta Nurmansyah
author_facet Adly Havendri
Dendi Adi Saputra
Mulya Cipta Nurmansyah
author_sort Adly Havendri
collection DOAJ
description In this research, development of a pico hydro power plant utilizing the river with water flow 0.6 m<sup>3</sup>/s and head 1.5 m is conducted. According to the available potential of the area, the waterwheel turbine with type undershot and efficiency about 71-76% is selected. The synchronize generator with 1 phase and 10 kVA capacity is chosen according the maximum generated power of the plant power which is about 8.81 kW. Due to the loses inside the turbine and generator, therefore the average electrical power that can be distributed is 4.96 kW. For stabilizing the voltage and current from the generator, a 7,5 kVA stabilizer with safety factor 20% is used. As the result, the stable electrical power 34.759,68 kWh can be generated every year with the capacity factor about 80%. The design results of the pico hydro power plant indicated that the power plant in Garabak Data able to produce the electrical power about Rp899,05 per kWh.
format Article
id doaj-art-9865e75d982e45a59a640f343bac8614
institution Kabale University
issn 2598-1137
2597-4483
language English
publishDate 2017-08-01
publisher Department of Mechanical Engineering, Faculty of Engineering, Universitas Andalas
record_format Article
series Metal: Jurnal Sistem Mekanik dan Termal
spelling doaj-art-9865e75d982e45a59a640f343bac86142025-02-01T10:20:39ZengDepartment of Mechanical Engineering, Faculty of Engineering, Universitas AndalasMetal: Jurnal Sistem Mekanik dan Termal2598-11372597-44832017-08-0111202610.25077/metal.1.1.20-26.20173Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera BaratAdly Havendri0Dendi Adi Saputra1Mulya Cipta Nurmansyah2Jurusan Teknik Mesin, Universitas Andalas, PadangJurusan Teknik Mesin, Universitas Andalas, PadangJurusan Teknik Mesin, Universitas Andalas, PadangIn this research, development of a pico hydro power plant utilizing the river with water flow 0.6 m<sup>3</sup>/s and head 1.5 m is conducted. According to the available potential of the area, the waterwheel turbine with type undershot and efficiency about 71-76% is selected. The synchronize generator with 1 phase and 10 kVA capacity is chosen according the maximum generated power of the plant power which is about 8.81 kW. Due to the loses inside the turbine and generator, therefore the average electrical power that can be distributed is 4.96 kW. For stabilizing the voltage and current from the generator, a 7,5 kVA stabilizer with safety factor 20% is used. As the result, the stable electrical power 34.759,68 kWh can be generated every year with the capacity factor about 80%. The design results of the pico hydro power plant indicated that the power plant in Garabak Data able to produce the electrical power about Rp899,05 per kWh.https://metal.ft.unand.ac.id/index.php/metal/article/view/4
spellingShingle Adly Havendri
Dendi Adi Saputra
Mulya Cipta Nurmansyah
Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera Barat
Metal: Jurnal Sistem Mekanik dan Termal
title Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera Barat
title_full Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera Barat
title_fullStr Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera Barat
title_full_unstemmed Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera Barat
title_short Perancangan dan Analisis Ekonomi Pembangunan Pembangkit Listrik Tenaga Piko Hidro di Desa Garabak Data Kabupaten Solok Sumatera Barat
title_sort perancangan dan analisis ekonomi pembangunan pembangkit listrik tenaga piko hidro di desa garabak data kabupaten solok sumatera barat
url https://metal.ft.unand.ac.id/index.php/metal/article/view/4
work_keys_str_mv AT adlyhavendri perancangandananalisisekonomipembangunanpembangkitlistriktenagapikohidrodidesagarabakdatakabupatensoloksumaterabarat
AT dendiadisaputra perancangandananalisisekonomipembangunanpembangkitlistriktenagapikohidrodidesagarabakdatakabupatensoloksumaterabarat
AT mulyaciptanurmansyah perancangandananalisisekonomipembangunanpembangkitlistriktenagapikohidrodidesagarabakdatakabupatensoloksumaterabarat