Selection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment Position

It is generally accepted that selecting the key segment position for trapezoidal tapered rings and controlling the shield machine advancement are challenging tasks for shield tunneling projects. In this work, we propose a method for calculating the key segment position based on the shield tail gap,...

Full description

Saved in:
Bibliographic Details
Main Authors: Wencui Zhang, Jian Zhang, Jingru Yan, Yaohong Zhu
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/3606389
Tags: Add Tag
No Tags, Be the first to tag this record!