Selection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment Position

It is generally accepted that selecting the key segment position for trapezoidal tapered rings and controlling the shield machine advancement are challenging tasks for shield tunneling projects. In this work, we propose a method for calculating the key segment position based on the shield tail gap,...

Full description

Saved in:
Bibliographic Details
Main Authors: Wencui Zhang, Jian Zhang, Jingru Yan, Yaohong Zhu
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/3606389
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832551689291300864
author Wencui Zhang
Jian Zhang
Jingru Yan
Yaohong Zhu
author_facet Wencui Zhang
Jian Zhang
Jingru Yan
Yaohong Zhu
author_sort Wencui Zhang
collection DOAJ
description It is generally accepted that selecting the key segment position for trapezoidal tapered rings and controlling the shield machine advancement are challenging tasks for shield tunneling projects. In this work, we propose a method for calculating the key segment position based on the shield tail gap, jack stroke difference, and lining trend. To calculate all possible key segment positions other than that corresponding to the straight joint configuration, the shield tail gap that remains after segment assembly and the jack stroke difference corresponding to the advancement of the segmental lining and lining trend were computed; then, values and importance coefficients were assigned to these factors according to current operating conditions. To ensure that the segmental lining can be assembled successfully with the calculated key position, we established a model to calculate the change in the shield tail gap before and after shield machine advancement based on the spatial relationships of the shield machine, the currently installed segmental rings, and the segment to be installed. Further, we propose a method for calculating the range of jack stroke differences when the predetermined “permitted shield tail gap” and key position are provided. The method is based on the change in the shield tail gap calculated with the above model and the positional relationship between the shield machine’s actual axis and the designed tunnel axis after the current segmental ring has been assembled. The calculated range of jack stroke differences may then be used to control the advancement of the shield machine. We validated the viability of our methods by using the data of Phase 1 works on Line 2 of the Ningbo Rail Transit system.
format Article
id doaj-art-981ac6b6d7cc47338141c793a6e7a3cc
institution Kabale University
issn 1687-8094
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-981ac6b6d7cc47338141c793a6e7a3cc2025-02-03T06:00:49ZengWileyAdvances in Civil Engineering1687-80942021-01-01202110.1155/2021/3606389Selection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment PositionWencui Zhang0Jian Zhang1Jingru Yan2Yaohong Zhu3College of Civil Engineering and ArchitectureCollege of Civil Engineering and ArchitectureCollege of Civil Engineering and ArchitectureSchool of Civil and Environmental EngineeringIt is generally accepted that selecting the key segment position for trapezoidal tapered rings and controlling the shield machine advancement are challenging tasks for shield tunneling projects. In this work, we propose a method for calculating the key segment position based on the shield tail gap, jack stroke difference, and lining trend. To calculate all possible key segment positions other than that corresponding to the straight joint configuration, the shield tail gap that remains after segment assembly and the jack stroke difference corresponding to the advancement of the segmental lining and lining trend were computed; then, values and importance coefficients were assigned to these factors according to current operating conditions. To ensure that the segmental lining can be assembled successfully with the calculated key position, we established a model to calculate the change in the shield tail gap before and after shield machine advancement based on the spatial relationships of the shield machine, the currently installed segmental rings, and the segment to be installed. Further, we propose a method for calculating the range of jack stroke differences when the predetermined “permitted shield tail gap” and key position are provided. The method is based on the change in the shield tail gap calculated with the above model and the positional relationship between the shield machine’s actual axis and the designed tunnel axis after the current segmental ring has been assembled. The calculated range of jack stroke differences may then be used to control the advancement of the shield machine. We validated the viability of our methods by using the data of Phase 1 works on Line 2 of the Ningbo Rail Transit system.http://dx.doi.org/10.1155/2021/3606389
spellingShingle Wencui Zhang
Jian Zhang
Jingru Yan
Yaohong Zhu
Selection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment Position
Advances in Civil Engineering
title Selection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment Position
title_full Selection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment Position
title_fullStr Selection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment Position
title_full_unstemmed Selection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment Position
title_short Selection of the Key Segment Position for Trapezoidal Tapered Rings and Calculation of the Range of Jack Stroke Differences with a Predetermined Key Segment Position
title_sort selection of the key segment position for trapezoidal tapered rings and calculation of the range of jack stroke differences with a predetermined key segment position
url http://dx.doi.org/10.1155/2021/3606389
work_keys_str_mv AT wencuizhang selectionofthekeysegmentpositionfortrapezoidaltaperedringsandcalculationoftherangeofjackstrokedifferenceswithapredeterminedkeysegmentposition
AT jianzhang selectionofthekeysegmentpositionfortrapezoidaltaperedringsandcalculationoftherangeofjackstrokedifferenceswithapredeterminedkeysegmentposition
AT jingruyan selectionofthekeysegmentpositionfortrapezoidaltaperedringsandcalculationoftherangeofjackstrokedifferenceswithapredeterminedkeysegmentposition
AT yaohongzhu selectionofthekeysegmentpositionfortrapezoidaltaperedringsandcalculationoftherangeofjackstrokedifferenceswithapredeterminedkeysegmentposition