Integrated Scheduling Problem on a Single Bounded Batch Machine with an Unavailability Constraint
We consider a scheduling problem where a set of jobs are first processed on a machine with an unavailability interval and, then, delivered to the customer directly. We focus on an integrated schedule of production and distribution such that the sum of the maximum delivery time and total delivery cos...
Saved in:
Main Author: | Jing Fan |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2020/8625849 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Hybrid Metaheuristics for Solving a Fuzzy Single Batch-Processing Machine Scheduling Problem
by: S. Molla-Alizadeh-Zavardehi, et al.
Published: (2014-01-01) -
Scheduling on a Single Machine and Parallel Machines with Batch Deliveries and Potential Disruption
by: Hua Gong, et al.
Published: (2020-01-01) -
Addressing the conundrum of unavailable name-bearing types
by: David L. Hawksworth
Published: (2012-12-01) -
Parallel-Batch Scheduling with Two Models of Deterioration to Minimize the Makespan
by: Cuixia Miao
Published: (2014-01-01) -
Parallel Batch Scheduling of Deteriorating Jobs with Release Dates and Rejection
by: Juan Zou, et al.
Published: (2014-01-01)