Integrated Design Technology of Geological Engineering for Pressure Flooding and Water Injection in Low Permeability Reservoirs: Take the Reservoir of Keshang Formation in Wu2 East Area as an Example

The objective factors of low permeability reservoir determine that there is obvious starting pressure gradient in waterflooding development, and the injection pressure is high. Conventional waterflooding has the technical bottleneck of “no injection and no flooding.” It highlights the development co...

Full description

Saved in:
Bibliographic Details
Main Authors: Ming Qin, Chao Chen, Qingsen Yu, Zhenping Liu, Zhibo Liu, Hanlie Cheng, Fahim Theon
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Journal of Chemistry
Online Access:http://dx.doi.org/10.1155/2022/1392831
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832548621601472512
author Ming Qin
Chao Chen
Qingsen Yu
Zhenping Liu
Zhibo Liu
Hanlie Cheng
Fahim Theon
author_facet Ming Qin
Chao Chen
Qingsen Yu
Zhenping Liu
Zhibo Liu
Hanlie Cheng
Fahim Theon
author_sort Ming Qin
collection DOAJ
description The objective factors of low permeability reservoir determine that there is obvious starting pressure gradient in waterflooding development, and the injection pressure is high. Conventional waterflooding has the technical bottleneck of “no injection and no flooding.” It highlights the development contradictions such as serious under-injection, rapid production decline and difficult production of reserves. Pressurized water injection is a new technology of unconventional water injection to enhance oil recovery, which can improve the production degree of low permeability reservoir reserves and solve the problem of water injection difficulty. In order to ensure the reliability of scheme design and the success rate of field implementation, the key technologies of unconventional oil and gas reservoir geological engineering integration are applied for the first time, including 3D geological modeling technology, geomechanics modeling technology, complex fracture network simulation technology of geological engineering integration and numerical simulation technology, and a fine 3D dynamic and static model covering all elements of geology and engineering is objectively established. Through numerical simulation research, the optimal water injection parameters of pressure flooding are determined, and the implementation effect of the optimal scheme is predicted, which provides a scientific basis for field implementation.
format Article
id doaj-art-943a4313ce044837a273ab8dbafaa0c7
institution Kabale University
issn 2090-9071
language English
publishDate 2022-01-01
publisher Wiley
record_format Article
series Journal of Chemistry
spelling doaj-art-943a4313ce044837a273ab8dbafaa0c72025-02-03T06:13:35ZengWileyJournal of Chemistry2090-90712022-01-01202210.1155/2022/1392831Integrated Design Technology of Geological Engineering for Pressure Flooding and Water Injection in Low Permeability Reservoirs: Take the Reservoir of Keshang Formation in Wu2 East Area as an ExampleMing Qin0Chao Chen1Qingsen Yu2Zhenping Liu3Zhibo Liu4Hanlie Cheng5Fahim Theon6Exploration and Development Research InstituteExploration and Development Research InstituteExploration and Development Research InstituteExploration and Development Research InstituteJerry Energy Services LtdSchool of Energy ResourceThe King’s SchoolThe objective factors of low permeability reservoir determine that there is obvious starting pressure gradient in waterflooding development, and the injection pressure is high. Conventional waterflooding has the technical bottleneck of “no injection and no flooding.” It highlights the development contradictions such as serious under-injection, rapid production decline and difficult production of reserves. Pressurized water injection is a new technology of unconventional water injection to enhance oil recovery, which can improve the production degree of low permeability reservoir reserves and solve the problem of water injection difficulty. In order to ensure the reliability of scheme design and the success rate of field implementation, the key technologies of unconventional oil and gas reservoir geological engineering integration are applied for the first time, including 3D geological modeling technology, geomechanics modeling technology, complex fracture network simulation technology of geological engineering integration and numerical simulation technology, and a fine 3D dynamic and static model covering all elements of geology and engineering is objectively established. Through numerical simulation research, the optimal water injection parameters of pressure flooding are determined, and the implementation effect of the optimal scheme is predicted, which provides a scientific basis for field implementation.http://dx.doi.org/10.1155/2022/1392831
spellingShingle Ming Qin
Chao Chen
Qingsen Yu
Zhenping Liu
Zhibo Liu
Hanlie Cheng
Fahim Theon
Integrated Design Technology of Geological Engineering for Pressure Flooding and Water Injection in Low Permeability Reservoirs: Take the Reservoir of Keshang Formation in Wu2 East Area as an Example
Journal of Chemistry
title Integrated Design Technology of Geological Engineering for Pressure Flooding and Water Injection in Low Permeability Reservoirs: Take the Reservoir of Keshang Formation in Wu2 East Area as an Example
title_full Integrated Design Technology of Geological Engineering for Pressure Flooding and Water Injection in Low Permeability Reservoirs: Take the Reservoir of Keshang Formation in Wu2 East Area as an Example
title_fullStr Integrated Design Technology of Geological Engineering for Pressure Flooding and Water Injection in Low Permeability Reservoirs: Take the Reservoir of Keshang Formation in Wu2 East Area as an Example
title_full_unstemmed Integrated Design Technology of Geological Engineering for Pressure Flooding and Water Injection in Low Permeability Reservoirs: Take the Reservoir of Keshang Formation in Wu2 East Area as an Example
title_short Integrated Design Technology of Geological Engineering for Pressure Flooding and Water Injection in Low Permeability Reservoirs: Take the Reservoir of Keshang Formation in Wu2 East Area as an Example
title_sort integrated design technology of geological engineering for pressure flooding and water injection in low permeability reservoirs take the reservoir of keshang formation in wu2 east area as an example
url http://dx.doi.org/10.1155/2022/1392831
work_keys_str_mv AT mingqin integrateddesigntechnologyofgeologicalengineeringforpressurefloodingandwaterinjectioninlowpermeabilityreservoirstakethereservoirofkeshangformationinwu2eastareaasanexample
AT chaochen integrateddesigntechnologyofgeologicalengineeringforpressurefloodingandwaterinjectioninlowpermeabilityreservoirstakethereservoirofkeshangformationinwu2eastareaasanexample
AT qingsenyu integrateddesigntechnologyofgeologicalengineeringforpressurefloodingandwaterinjectioninlowpermeabilityreservoirstakethereservoirofkeshangformationinwu2eastareaasanexample
AT zhenpingliu integrateddesigntechnologyofgeologicalengineeringforpressurefloodingandwaterinjectioninlowpermeabilityreservoirstakethereservoirofkeshangformationinwu2eastareaasanexample
AT zhiboliu integrateddesigntechnologyofgeologicalengineeringforpressurefloodingandwaterinjectioninlowpermeabilityreservoirstakethereservoirofkeshangformationinwu2eastareaasanexample
AT hanliecheng integrateddesigntechnologyofgeologicalengineeringforpressurefloodingandwaterinjectioninlowpermeabilityreservoirstakethereservoirofkeshangformationinwu2eastareaasanexample
AT fahimtheon integrateddesigntechnologyofgeologicalengineeringforpressurefloodingandwaterinjectioninlowpermeabilityreservoirstakethereservoirofkeshangformationinwu2eastareaasanexample