Mechanism of Roadway Floor Heave Controlled by Floor Corner Pile in Deep Roadway under High Horizontal Stress

In order to overcome the support difficulty of serious floor heave caused by rock burst, with the floor heave of ventilation roadway in Hegang Xing An Coal Mine as the engineering background, the treatment scheme of the concrete-filled steel tube corner pile and floor grouting is put forward. Based...

Full description

Saved in:
Bibliographic Details
Main Authors: Xinchao Kang, Dongming Guo, Zhiying Lu
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6669233
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832567882182033408
author Xinchao Kang
Dongming Guo
Zhiying Lu
author_facet Xinchao Kang
Dongming Guo
Zhiying Lu
author_sort Xinchao Kang
collection DOAJ
description In order to overcome the support difficulty of serious floor heave caused by rock burst, with the floor heave of ventilation roadway in Hegang Xing An Coal Mine as the engineering background, the treatment scheme of the concrete-filled steel tube corner pile and floor grouting is put forward. Based on the solution of the slip line field under plane strain condition, the mechanical model of the slip-type floor heave is established, and the formula for calculating the critical failure depth of the roadway floor and the minimum support depth of the corner pile is derived. Through numerical analysis and similar model tests, the deformation and stress distribution of surrounding rock under the support of the corner piles are studied, and the force law of the pile under high horizontal stress is analyzed. The results show that, compared with the floor corner anchor, the floor corner pile + floor grouting support scheme can significantly improve the mechanical properties of the floor rock mass, and the plastic slip line of the floor plate part can be cut by corner piles, which effectively controls the deformation of the floor plate under high horizontal stress; the length and inclination angle of the corner pile have a great influence on the support effect. In the on-site treatment scheme, 1.1 times the calculated length of pile should be selected. The results of a similar model and field test show that the corner pile is effective in controlling the deformation of roadway floor and two sides.
format Article
id doaj-art-92eff9af9023499c849536254ab77cfe
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-92eff9af9023499c849536254ab77cfe2025-02-03T01:00:15ZengWileyAdvances in Civil Engineering1687-80861687-80942021-01-01202110.1155/2021/66692336669233Mechanism of Roadway Floor Heave Controlled by Floor Corner Pile in Deep Roadway under High Horizontal StressXinchao Kang0Dongming Guo1Zhiying Lu2School of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, ChinaIn order to overcome the support difficulty of serious floor heave caused by rock burst, with the floor heave of ventilation roadway in Hegang Xing An Coal Mine as the engineering background, the treatment scheme of the concrete-filled steel tube corner pile and floor grouting is put forward. Based on the solution of the slip line field under plane strain condition, the mechanical model of the slip-type floor heave is established, and the formula for calculating the critical failure depth of the roadway floor and the minimum support depth of the corner pile is derived. Through numerical analysis and similar model tests, the deformation and stress distribution of surrounding rock under the support of the corner piles are studied, and the force law of the pile under high horizontal stress is analyzed. The results show that, compared with the floor corner anchor, the floor corner pile + floor grouting support scheme can significantly improve the mechanical properties of the floor rock mass, and the plastic slip line of the floor plate part can be cut by corner piles, which effectively controls the deformation of the floor plate under high horizontal stress; the length and inclination angle of the corner pile have a great influence on the support effect. In the on-site treatment scheme, 1.1 times the calculated length of pile should be selected. The results of a similar model and field test show that the corner pile is effective in controlling the deformation of roadway floor and two sides.http://dx.doi.org/10.1155/2021/6669233
spellingShingle Xinchao Kang
Dongming Guo
Zhiying Lu
Mechanism of Roadway Floor Heave Controlled by Floor Corner Pile in Deep Roadway under High Horizontal Stress
Advances in Civil Engineering
title Mechanism of Roadway Floor Heave Controlled by Floor Corner Pile in Deep Roadway under High Horizontal Stress
title_full Mechanism of Roadway Floor Heave Controlled by Floor Corner Pile in Deep Roadway under High Horizontal Stress
title_fullStr Mechanism of Roadway Floor Heave Controlled by Floor Corner Pile in Deep Roadway under High Horizontal Stress
title_full_unstemmed Mechanism of Roadway Floor Heave Controlled by Floor Corner Pile in Deep Roadway under High Horizontal Stress
title_short Mechanism of Roadway Floor Heave Controlled by Floor Corner Pile in Deep Roadway under High Horizontal Stress
title_sort mechanism of roadway floor heave controlled by floor corner pile in deep roadway under high horizontal stress
url http://dx.doi.org/10.1155/2021/6669233
work_keys_str_mv AT xinchaokang mechanismofroadwayfloorheavecontrolledbyfloorcornerpileindeeproadwayunderhighhorizontalstress
AT dongmingguo mechanismofroadwayfloorheavecontrolledbyfloorcornerpileindeeproadwayunderhighhorizontalstress
AT zhiyinglu mechanismofroadwayfloorheavecontrolledbyfloorcornerpileindeeproadwayunderhighhorizontalstress