Multiple-Devices-Process Integrated Scheduling Algorithm with Time-Selective Strategy for Process Sequence
This paper is in view of the current algorithm to solve Multiple-Devices-Process integrated scheduling problems without considering parallel process between the parallel processing. Meanwhile, the influence of the first processing procedure on the second processing procedure is ignored, resulting in...
Saved in:
Main Authors: | Xiaohuan Zhang, Dan Zhang, Zhen Wang, Yu Xin |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2020/8898536 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An Improved Integrated Scheduling Algorithm with Process Sequence Time-Selective Strategy
by: Zhen Wang, et al.
Published: (2021-01-01) -
Retracted: Multiple-Devices-Process Integrated Scheduling Algorithm with Time-Selective Strategy for Process Sequence
by: null Complexity
Published: (2024-01-01) -
Integrated Project Scheduling and Staff Assignment with Controllable Processing Times
by: Victor Fernandez-Viagas, et al.
Published: (2014-01-01) -
Group Scheduling with Learning Effect and Random Processing Time
by: Dingyu Wang, et al.
Published: (2021-01-01) -
Due-Window Assignment Scheduling with Variable Job Processing Times
by: Yu-Bin Wu, et al.
Published: (2015-01-01)