Multi-objective optimization of the U-shaped assembly line balancing and worker assignment considering setup-times and workers' skill
Purpose: In this research due to the importance of the U-shaped assembly line balancing and, on the other hand, the importance of human factors and setup times, we want to develop a bi-objective mathematical model minimize the cycle time and the total cost.Methodology: Since the research problem is...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | fas |
Published: |
Ayandegan Institute of Higher Education, Tonekabon,
2023-08-01
|
Series: | تصمیم گیری و تحقیق در عملیات |
Subjects: | |
Online Access: | https://www.journal-dmor.ir/article_136827_a8b54d6bae7344bb9ba23aa456a88acb.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Purpose: In this research due to the importance of the U-shaped assembly line balancing and, on the other hand, the importance of human factors and setup times, we want to develop a bi-objective mathematical model minimize the cycle time and the total cost.Methodology: Since the research problem is shown to be NP-hard, NSGA-II, which is a population-based algorithm, and also SPEA-II are used to solve the problem.Findings: A mathematical model for the problem on hand is developed. We solve the problem using NSGA-II and SPEA-II. We use four criteria for analyzing the results of the mathematical model and evaluating the performance of the multi-objective evolutionary algorithms. The experimental results demonstrate that NSGA-II is superior to SPEA-II.Originality/Value: A bi-objective mathematical model for the U-shaped assembly line balancing problem considering setup-times and workers' skill is developed, and the problem is solved using two algorithms. |
---|---|
ISSN: | 2538-5097 2676-6159 |