Integrated Urban Design Methodology of “Planning-Construction-Management” and Intelligent Management and Control Based on Teaching Reproduction Robot

With regard to the problems in the integrated urban construction based on “planning-construction–management,” the main issues that include the tight construction cycle, the high operation standards, the relatively extensive range of management data sources, the uneven information control, the relati...

Full description

Saved in:
Bibliographic Details
Main Author: Haipeng Wang
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Journal of Robotics
Online Access:http://dx.doi.org/10.1155/2022/4669792
Tags: Add Tag
No Tags, Be the first to tag this record!