Risk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model
Karst is an unfavorable geology that is very undesirable in tunnel construction. It is extremely risky due to the complexity and fuzziness of shield excavation in karst strata. To reduce the construction risk of shield tunneling in karst strata, a risk assessment method based on cloud model and fuzz...
Saved in:
Main Authors: | Guowang Meng, Yangchun Ye, Bo Wu, Guijun Luo, Xu Zhang, Zhiqiang Zhou, Wentao Sun |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Shock and Vibration |
Online Access: | http://dx.doi.org/10.1155/2021/7237136 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research on Shield Tunnelling Parameters Correlation in Composite Strata
by: Ziqi Guo, et al.
Published: (2022-01-01) -
Analytical Solution of Seepage Field in Karst Tunnel
by: Chong Jiang, et al.
Published: (2018-01-01) -
Reasonable Treatment Range of Karst Cave Encountered by Super-Large Diameter Shield Tunnel in Strongly Karst-Developed Area
by: Jiang Wang, et al.
Published: (2024-01-01) -
Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction
by: Yong Xu, et al.
Published: (2022-01-01) -
Construction Risk Assessment of Tunnel Crossing Goaf Based on Analytic Hierarchy Process‐Extension Theory Model
by: Chao Yuan, et al.
Published: (2025-01-01)