Early Loading of Cast-in-Situ Reinforced Concrete Structures
The article provides an overview of the existing methods of early loading of monolithic structures. It is shown that keeping concrete up to standard strength without taking into account the stages of loading leads to a significant increase in the cost of work, especially in winter. Based on experime...
Saved in:
Main Author: | A. H. Baiburin |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2023-04-01
|
Series: | Железобетонные конструкции |
Subjects: | |
Online Access: | https://www.g-b-k.ru/jour/article/view/12 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Assessing the Effect of Air Blast Loading on the Structural Behaviour of Reinforced Concrete Column.
by: Kasyage, Abubakali
Published: (2025) -
Investigation of the Influence of Local Low Strength Concrete on the Bearing Capacity of Bending Reinforced Concrete Beams
by: A. G. Tamrazyan
Published: (2024-02-01) -
Future of Reinforced Concrete Design Codes: Challenges and Perspectives
by: Mikalai A. Rak, et al.
Published: (2023-10-01) -
Selection of Transverse Bars in Reinforced Concrete Beams while Ensuring the Minimum Consumption of Reinforcement
by: Yu. A. Shaposhnikova, et al.
Published: (2023-04-01) -
Reinforced and Prestressed Concrete /
by: Kong, F. K.
Published: (1995)