Research on the Settlement Regulation and Stability of Large Building Foundation over Gobs: A Case Study in the Xiangcheng Coal Mine, China
Due to the acceleration of urbanization in China, the land use and new building construction in mining subsidence areas are increasing. However, a large high-rise building (100 m × 80 m × 100 m) was planned to be built above gob areas in the Xiangcheng Mine subsidence area. According to the analysis...
Saved in:
Main Authors: | Wenyan Guo, Bingnan Hu, Junying Zhang, Qingtong Chen, Xinguo Jia, Jianghua Li |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Shock and Vibration |
Online Access: | http://dx.doi.org/10.1155/2021/5533098 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Grouting Reinforcement of Large Building Foundation over Old Gob Areas: A Case Study in Huaibei Mining Area, China
by: Wenyan Guo, et al.
Published: (2018-01-01) -
Failure Mechanism of Gob-Side Roadway under Overlying Coal Pillar Multiseam Mining
by: Hongwei Mu, et al.
Published: (2021-01-01) -
Influence of Foundation Pit Excavation and Precipitation on Settlement of Surrounding Buildings
by: Hongming Wei
Published: (2021-01-01) -
Disastrous Mechanism of Water Discharge in Abandoned Gob above the Stope in Mining Extra-Thick Coal Seam
by: Haixiao Lin, et al.
Published: (2021-01-01) -
The Stability of Gob-Side Entry Retaining in a High-Gas-Risk Mine
by: Junwen Zhang, et al.
Published: (2019-01-01)