ANALYSIS AND RISKS FAST TRACK AND CRASH PROGRAM METHOD ON BUILDING PROJECT

Project delay is a major issue in execution, often causing cost overruns if not addressed. Acceleration helps meet targets and increase profits. Research on fast track and crash programme methods is extensive, but mainly focuses on case studies rather than risks or work quality. Building X’s constr...

Full description

Saved in:
Bibliographic Details
Main Authors: A'izzatul Khiyana, Titin Sundari, Totok Yulianto, Meriana Wahyu Nugroho, Achmad Imam Agung
Format: Article
Language:English
Published: Universitas Negeri Jakarta 2025-01-01
Series:Jurnal Pensil
Subjects:
Online Access:https://journal.unj.ac.id/unj/index.php/jpensil/article/view/50234
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832575530635886592
author A'izzatul Khiyana
Titin Sundari
Totok Yulianto
Meriana Wahyu Nugroho
Achmad Imam Agung
author_facet A'izzatul Khiyana
Titin Sundari
Totok Yulianto
Meriana Wahyu Nugroho
Achmad Imam Agung
author_sort A'izzatul Khiyana
collection DOAJ
description Project delay is a major issue in execution, often causing cost overruns if not addressed. Acceleration helps meet targets and increase profits. Research on fast track and crash programme methods is extensive, but mainly focuses on case studies rather than risks or work quality. Building X’s construction project faced a 3rd-week delay, extending from 23 weeks (December 2022) to 25 weeks (January 2023). This study aims to determine the most time- and cost-efficient acceleration method using primary (questionnaire) and secondary data (S-curve, unit price analysis, budget plan, and project reports). Applying fast track and crash programme methods along with risk frequency analysis, the study identifies the fast-track method as optimal, reducing project time to 22 weeks with 12% efficiency and Rp. 759,698,484.61 in cost savings. However, a potential risk is concrete cracks due to acceleration. This research complements previous studies by integrating risk analysis and quality assessment in fast-track acceleration.
format Article
id doaj-art-87091a30b30c4448bbd301c3c9246ebc
institution Kabale University
issn 2301-8437
2623-1085
language English
publishDate 2025-01-01
publisher Universitas Negeri Jakarta
record_format Article
series Jurnal Pensil
spelling doaj-art-87091a30b30c4448bbd301c3c9246ebc2025-02-01T02:58:16ZengUniversitas Negeri JakartaJurnal Pensil2301-84372623-10852025-01-0114110.21009/jpensil.v14i1.50234ANALYSIS AND RISKS FAST TRACK AND CRASH PROGRAM METHOD ON BUILDING PROJECTA'izzatul Khiyana0Titin Sundari1Totok Yulianto2Meriana Wahyu Nugroho3Achmad Imam Agung4Teknik Sipil, Fakultas Teknik, Universitas Hasyim Asy’ari Tebuireng Jombang Jalan Irian Jaya No. 55, Diwek, Jombang, Jawa Timur, 61471, IndonesiaTeknik Sipil, Fakultas Teknik, Universitas Hasyim Asy’ari Tebuireng Jombang Jalan Irian Jaya No. 55, Diwek, Jombang, Jawa Timur, 61471, IndonesiaTeknik Sipil, Fakultas Teknik, Universitas Hasyim Asy’ari Tebuireng Jombang Jalan Irian Jaya No. 55, Diwek, Jombang, Jawa Timur, 61471, IndonesiaTeknik Sipil, Fakultas Teknik, Universitas Hasyim Asy’ari Tebuireng Jombang Jalan Irian Jaya No. 55, Diwek, Jombang, Jawa Timur, 61471, IndonesiaPendidikan Teknik Elektro, Fakultas Teknik, Universitas Negeri Surabaya, Jalan Lidah Wetan, Lakarsantri, Surabaya, Jawa Timur, 60231, Indonesia Project delay is a major issue in execution, often causing cost overruns if not addressed. Acceleration helps meet targets and increase profits. Research on fast track and crash programme methods is extensive, but mainly focuses on case studies rather than risks or work quality. Building X’s construction project faced a 3rd-week delay, extending from 23 weeks (December 2022) to 25 weeks (January 2023). This study aims to determine the most time- and cost-efficient acceleration method using primary (questionnaire) and secondary data (S-curve, unit price analysis, budget plan, and project reports). Applying fast track and crash programme methods along with risk frequency analysis, the study identifies the fast-track method as optimal, reducing project time to 22 weeks with 12% efficiency and Rp. 759,698,484.61 in cost savings. However, a potential risk is concrete cracks due to acceleration. This research complements previous studies by integrating risk analysis and quality assessment in fast-track acceleration. https://journal.unj.ac.id/unj/index.php/jpensil/article/view/50234Critical Path, Fast Track, Crash Program, Time, Cost, Risk
spellingShingle A'izzatul Khiyana
Titin Sundari
Totok Yulianto
Meriana Wahyu Nugroho
Achmad Imam Agung
ANALYSIS AND RISKS FAST TRACK AND CRASH PROGRAM METHOD ON BUILDING PROJECT
Jurnal Pensil
Critical Path, Fast Track, Crash Program, Time, Cost, Risk
title ANALYSIS AND RISKS FAST TRACK AND CRASH PROGRAM METHOD ON BUILDING PROJECT
title_full ANALYSIS AND RISKS FAST TRACK AND CRASH PROGRAM METHOD ON BUILDING PROJECT
title_fullStr ANALYSIS AND RISKS FAST TRACK AND CRASH PROGRAM METHOD ON BUILDING PROJECT
title_full_unstemmed ANALYSIS AND RISKS FAST TRACK AND CRASH PROGRAM METHOD ON BUILDING PROJECT
title_short ANALYSIS AND RISKS FAST TRACK AND CRASH PROGRAM METHOD ON BUILDING PROJECT
title_sort analysis and risks fast track and crash program method on building project
topic Critical Path, Fast Track, Crash Program, Time, Cost, Risk
url https://journal.unj.ac.id/unj/index.php/jpensil/article/view/50234
work_keys_str_mv AT aizzatulkhiyana analysisandrisksfasttrackandcrashprogrammethodonbuildingproject
AT titinsundari analysisandrisksfasttrackandcrashprogrammethodonbuildingproject
AT totokyulianto analysisandrisksfasttrackandcrashprogrammethodonbuildingproject
AT merianawahyunugroho analysisandrisksfasttrackandcrashprogrammethodonbuildingproject
AT achmadimamagung analysisandrisksfasttrackandcrashprogrammethodonbuildingproject