Effects of Different Construction Sequences on Ground Surface Settlement and Displacement of Single Long Pile due to Twin Paralleled Shield Tunneling
Shield tunneling activities inevitably pass through pile foundations at close distance in densely urban areas. Various studies have investigated the interaction between newly constructed tunnels and existing pile foundations. However, the influence of different construction sequences of twin paralle...
Saved in:
Main Authors: | Kan Huang, Yiwei Sun, Xianqiang Huang, Yujian Li, Meng Jiang, Runing Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/5559233 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Temporal-Spatial Characteristics of Ground and Pile Responses to Twin Shield Tunneling in Clays
by: Minghong Sheng, et al.
Published: (2021-01-01) -
Simplified Analytical Method for Predicting the Lateral Ground Displacements due to Shield Tunnelling
by: Lianwei Sun, et al.
Published: (2021-01-01) -
Ground Deformation Characteristics Induced by Mechanized Shield Twin Tunnelling along Curved Alignments
by: Dangzhong Wu, et al.
Published: (2021-01-01) -
The Ground Settlement and the Existing Pipeline Response Induced by the Nonsynchronous Construction of a Twin-Tunnel
by: Shicheng Sun, et al.
Published: (2021-01-01) -
Ground Displacements due to the Deformations of Shallow Tunnels with Arbitrary Cross Sections in Soft Ground
by: Qiongfang Zhang, et al.
Published: (2021-01-01)